An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potential permitting impacts of new naaqs A&WMA Southern Section Annual Meeting Biloxi, MS September 12, 2012 Carla Brown, P.E. MS Dept. of Environmental Quality 601-961-5235 cbrown@deq.ms.gov

  2. NAAQS: New vs. Old *Final Rule that established the most current standard, excluding those rules revoking previous standards.

  3. “Background” Air Quality • The background concentrations must be added to modeled concentrations to determine compliance with NAAQS. • MS Ambient Air Data: • Annual PM-2.5 (2009-2011): 9.5-11.8 ug/m3 • 24-hr PM-2.5 (2009-2011): 18-23 ug/m3 • 1-hr NO2 (2011, only one site): 32 ppb • 1-hr SO2 (2011, only one site): 29 ppb • Problem – very limited monitor data and background can result in double-counting emissions from stationary sources that are also being included as nearby sources in the model.

  4. Case Study • Roxul, a proposed mineral wool facility, was MDEQ’s first PSD processed under these significant NAAQS changes. • Proposed emissions from Roxul: • PM-10/PM-2.5 = 562/510 TPY • SO2 = 1035 TPY • NOx = 403 TPY • Modeling initially predicted… • 35 violations of 1-hr SO2 • One violation of 24-hr SO2 • 61,446 violations of 1-hr NO2

  5. Modeled 1-hr NO2 Violations

  6. Culpability Analysis • Significant NOx contributions from natural gas compressor station engines: • Trunkline Compressor Station – 5,500 TPY PTE • ANR Sardis Compressor Station – 2,900 TPY PTE • Tennessee Gas, New Albany Compressor Station – 1,900 TPY PTE • For those receptors showing violations after applying the 0.8 NO2:NOx default ratio (still 34,475 instances), the highest contribution from Roxul was determined to be less than 30% of SIL. • Per 40 CFR 51.165(b), if less than the SIL, source/project does not cause or contribute to the violation.

  7. Impacts on Applications • For PSD projects, months added to application preparation. • MDEQ has suggested submitting applications piece-meal so as not to delay the permitting process. • Time and $$$ due to refining modeling runs to meet the standards or to show no culpability should there be modeled violations.

  8. Impacts on Permitting • How does the State address modeled violations due to existing sources? • Based on decisions from the Sixth Circuit Court (1978-80), modeled violations are considered just as valid as measured violations. • Require those significant sources to perform air quality analysis? • Include limitations in SIP or enforceable operating permit? • Install monitor(s) in area of highest predicted impacts (at whose expense?)

  9. Modeled vs. Monitored • Based upon current modeling protocols, modeled concentrations will generally be much greater than monitored. • EPA acknowledged this in March 1, 2011, guidance memo regarding the 1-hr NO2 standard. • Yet EPA had planned to require state-wide modeling to demonstrate compliance with the 1-hr SO2 standard (generally due to lack of monitors for SO2).