170 likes | 184 Views
This report provides an overview of the WLTP-DTP-AP campaign and lists open questions for the protocol. It includes definitions and analytical instrumentation requirements for aldehydes, ethanol, and ammonia. Access the consolidated draft and the list of open and closed issues.
E N D
WLTP-DTP-AP Status Report and Open issues DTP 14th Geneva, 5 June-2013 M.C. Astorga
OPEN QUESTIONS for NEW OI TABLE (after 13th DTP) 1 1 DEFINITION OF THE VP2 ad hoc CAMPAIGN -SEPTEMBER 2013 (JRC-Ispra , ITALY) 2
OPEN QUESTIONS for NEW OI TABLE (after 13th DTP) 1
[*] This OI table has been already presented to the EU-WLTP group in a phone conference on the 28th of March. No further comments have been done.
1 DEFINITION OF THE VP2 ad hoc CAMPAIGN -SEPTEMBER 2013 (JRC-Ispra , ITALY) 2
DEFINITION of the VP2 ad hoc CAMPAIGN-Sep 2013 (JRC) Aldhehydes (RCHO) and Ethanol (CH3CH2OH): 2 weeks
DEFINITION of the ad hoc VP2 CAMPAIGN -September 2013 : Ammonia (NH3): 1 week
WLTP-DTP-AP-21 uploaded/updated in the interest group WLTP-DTP (World Light duty Test Procedures development groups) (Category: Enterprise and Industry). direct access: https://circabc.europa.eu/w/browse/ Thanks for your attention…
WLTP-DTP-AP-21-06 08.03.2013 Consolidated Draft AP.docx uploaded/updated in the interest group WLTP-DTP (World Light duty Test Procedures development groups) (Category: Enterprise and Industry). direct access: https://circabc.europa.eu/w/browse/75cc4af8-cc22-4665-9156-e674e709452f
LIST of OPEN & CLOSED ISSUES [*] [*] This OI table has been already presented to the EU-WLTP group in a phone conference on the 28th of March. No further comments have been done.
LIST of OPEN & CLOSED ISSUES/2 [*] [*] This OI table has been already presented to the EU-WLTP group in a phone conference on the 28th of March. No further comments have been done.
DEFINITION OF PROTOCOL AP VP2 CAMPAIGN –Sept. 2013 (JRC): Aldhehydes and Ethanol
DEFINITION OF PROTOCOL AP VP2 CAMPAIGN –Sept. 2013 (JRC): Ammonia