Final Presentation. Team: India Plant: Resources Recovery Members: Lynette Hernandez, Hsin Ting Hsieh, Jose L. Ortiz, and Alexander J. Palmas Scribe: Alexander J. Palmas Mentor: Patrick H. Shannon, Middough. 1. Where we are located. 2. Outline for Final Presentation.

liona
Download Presentation

Final Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Presentation Team: India Plant: Resources Recovery Members: Lynette Hernandez, Hsin Ting Hsieh, Jose L. Ortiz, and Alexander J. Palmas Scribe: Alexander J. Palmas Mentor: Patrick H. Shannon, Middough 1

  2. Where we are located 2

  3. Outline for Final Presentation • Overall PFD and Design Basis for Water and CO2 • Total Production of Plant • Plant Layout • Initial Control Scheme • Overall Energy Requirements • Economics • Recommendations • Conclusion • Acknowledgements 3

  4. Water Overall PFD To Fertilizer and CHP plant 4

  5. Water Design Basis 5

  6. CO2 PFD 6

  7. CO2Design Basis 7

  8. What's Produced 8

  9. Process Waste Water and Frac Water Coming In and Process Water Out Plant Layout CO2 Sold for EOR Incoming CO2 9

  10. Initial Control Scheme 10

  11. Overall Energy Requirement 11

  12. Economics 12

  13. Economics 13

  14. Recommendations • Use a crystallizer/evaporator • Allow flow of free energy • Lower electricity cost by using low pressure steam that's already produced within the shale gas complex • Look into other alternatives for waste disposal other than landfill • Recycle/sell waste oils • Obtain a competitive CO2 Compressor quote 14

  15. Conclusion • Project life of 20 years • Plant needs to be built • Allows site to reach EPA requirements • Essential to entire plant 15

  16. Acknowledgements • Patrick Shannon • David Field • Professor Perl • Other mentors 16