130 likes | 143 Views
This study examines the evolution of local environmental planning in Kangwon Province, South Korea, focusing on the adoption of a new framework (DPSIGR) for effective environmental management. It analyzes the challenges faced, the process of planning, and the potential impacts on various sectors and environmental conditions. The study aims to improve the effectiveness and organization of local environmental planning efforts.
E N D
The Evolution of Local Environmental Planning for Kangwon Province Government June.6.2007 Dokyung Lee*, Muchoon Lee, Minho Hong Department of Environmental Engineering Yonsei University, South KOREA E-mail : lily3731@paran.com
Contents Objectives 1 2 Korean Environmental Planning 3 The Study of Present local Environmental Planning The Adoption of New Framework 4 The process of Kangwon’s Environmental Planning 5
1. Objectives • To figure out the Problems of EnvironmentalPlanning. • To establish the System of the Korean Local Environmental Planning(LEP). • To organize the Environmental Planning effectively.
2. Korean Environmental Planning • The History of Korean National Environmental Planning. • The Background of Korean National Environmental Planning. • What’s Korean LEP? • The Background of Korea’s LEP. • Introductionof the Guideline of Korea’s LEP.
3. The Problems of LEP for Kangwon province • Responses are not aimed at • achieving of Environmental Planning. LocalEnvironmental Planning • It’s difficult to estimate • the effectiveness of Responses. 3. The Indicators are not related to The projects occasionally.
4. The adoption of New framework - continue DPSIGR?? • DPSIR + G = “DPSIGR” • “DPSIR” : The casual framework for describing the interactions between society and the environment adopted by the EEA. • “DPSIGR” : The framework for Local Environmental Planning. • The aim of such an approach is : • To be able to provide information on all of the different elements in the “DPSIGR” chain. • to demonstrate their interconnection. • to estimate the effective of Responses.
Goal 4. The adoption of New framework - continue • Interaction of “DPSIGR” Chain Driving force Response Pressure State Impact
4. The adoption of New framework Driving force Pressure State Impact Goal • -Population • -Economic growth • -Industry Proportion • -Transportation • -Industry • -Leisure sports • -Road building -Air pollutants -Energy consumption -Noise exposure -Waste production -Land use -Developing pressure Environmental Condition -Air/atmosphere -Water -Land/soil -Wildlife/biodiversity -Natural resources -green space Environmental -Contaminations -Forestry destroy Economic -Slowdown of The Tourist Industry -Goal -Indicator • Examples • Expand the Conservative projects of forestry. • Conservation and management of wildlife sanctuary. • Development the Natural vacationland. Responses
The Final Goal The Issues The Goals for the Issues Indicators Projects Life Environment Civilization Environment Economy Environment 2 5. The process of Kangwon Local Environmental Planning 1 D, P, S, I Investigation and Analysis Natural Environment S 3 G 4 G 5 R
Conclusions • Explain the system of Korean Environmental Planning. • Find out the Problems of Local Environmental Planning. • And, We are trying to establish the System of Korean Environmental Planning,Asthe alternative. • On account of The “DPSIGR” chain reacts mutually , We can see the Interaction of “DPSIGR” chain easily and find out the proper projects for Indicators. • Consequently, The “DPSIGR” chain works on reporting of LEP and It helps decision maker, public see environmental, economic, and other issues as interconnected.