An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Colin Cranfield Reservoir Engineer Licensing and Consents Unit Aberdeen DTI Perspective on Reservoir Surveillance 15 September 2004

  2. Quote from the late Laurie Dake* Thorough data acquisition is expensive (very expensive) and it is the duty of practising reservoir engineers to convince those who hold the purse strings of the necessity of the exercise. * “The Practice of Reservoir Engineering”

  3. Overview • DTI-LCU remit • PILOT initiatives • UKCS reserves • Brown field growth • Reservoir surveillance • General issues • Field observations • Conclusions

  4. DTI-LCU aim • Maximise economic recovery of UK oil & gas • while minimising environmental impact

  5. Pre-development discussions AFRs submitted / Addenda to FDP Field determination issued FDP approved Field start-up COP Phased development ? Reservoir surveillance is important throughout field life • Need to establish economic viability of reservoir, .e.g EWTs • Gain reservoir understanding for effective management • Establish that reservoir is uneconomic prior to abandonment

  6. PILOT targets • Government – industry partnership • Striving to meet 2010 target

  7. PILOT targets • Government – industry partnership • Striving to meet 2010 target • Can only be achieved via • New field development • Brown field growth • Exploration success

  8. Actual production Forecast UKCS oil and gas production 2003 - 2010 PILOT targets 2005 & 2010 Source DTI 2003 annual reserves review UK production forecast (mmboe/d)

  9. DTI initiatives • PILOT • Fallow process • Promote licences • Access to data • Infrastructure code of practice • Brown field work group • Plus • Work with ITF on technology development • IOR conferences, web sites, eNewsletter

  10. Key Oil Gas Production to date P+P Reserves Possible reserves Unrecovered - UKCS recovery factor distribution Northern North Sea Oil Recovery 43% (upside 45%) Central North Sea Oil Recovery 46% (upside 49%) Gas Recovery 65% (upside 71%) Southern North Sea Gas Recovery 74% (upside 78%) Source DTI

  11. Improving brown field recovery Source UK Oil & Gas Commemorative Volumes

  12. Brown field growth • Brown field WG addressing barriers • Typical success factors • Cost control • Combining technologies • Technological advances • Drilling & completion • Geo-steering • Sub-sea tie-back • Improved reservoir understanding • Integrated approach • 3D/4D advances

  13. By-passed & trapped oil • Causes • Reservoir compartmentalisation • Fault shadows • Heterogeneity • Attics • Opportunities • Better utilise injection • Infill / sidetrack locations • Well work / re-perforation / water or gas shut-off

  14. 1) Existing wells draining effectively?

  15. Massive sands – un-perforated intervals Existing B2 perforations 10383 – 10423 ft md Un-perforated 10423 – 10470 ft md Existing B2 perforations 10478 – 10498 ft md 1) Existing wells draining effectively?

  16. 2) Existing wells draining effectively?

  17. Channel sands – un-perforated interval Un-perforated interval 11,770 – 11,790 ft md 2) Existing wells draining effectively?

  18. Gamma ray spikes – could they be horizontal barriers? 3) Existing wells draining effectively?

  19. Typical surveillance approaches • Routine • RFT, LWD, logging • Production performance • Non-routine • 3D/4D, geochem, geomech, SrRSA • Permanent surveillance • Difficulty in estimating value • More advanced cost/benefit analysis?

  20. Andrew production & 4D surveys Water Rate Maximising Brown field Recovery OIL Rate Baseline 3D 2001 2002 2004 3D/4D Survey acquisition

  21. Surveillance challenges – past and present • Compartmentalisation • Impacted injection strategies • Hydraulic fracturing • Poorly controlled water injection • Marginal / sub-sea developments • Pre-drilled wells • Based on static data • Non-optimum well placement • Defer injection wells? • Inaccurate zonal allocation • Inability to model reservoir

  22. Key Developed P+P Developed Fields Possible SST P+P SST Possible Undeveloped Probable Undeveloped Possible Potential Additional UKCS reserves categorised by development type UKCS reserves 20 billion boe Undeveloped Platform Fields Subsea tiebacks FPFs/FPSOs Source DTI web page

  23. Way forward - reservoir surveillance • Continue to refine and improve surveillance • Down-hole flow- & pressure-meters • By zone • Continue to integrate data observations • More sophisticated analysis • Tailor strategy to specific reservoir situation • Address key uncertainties • Develop case for thorough data acquisition

  24. For DTI oil & gas information: Thank you for listening http://www.og.dti.gov.uk/ or contact: colin.cranfield@dti.gsi.gov.uk 01224 254066