1 / 6

Injector Laser Heater Undulator

Injector Laser Heater Undulator. Jose Chan. Injector Laser-Hearter Undulator. Problems/Issues: Paul E. “Most OTR screens are unusable due to COTR ( laser heater should fix this in FY2009)”

liuz
Download Presentation

Injector Laser Heater Undulator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Injector Laser Heater Undulator Jose Chan

  2. Injector Laser-Hearter Undulator • Problems/Issues: Paul E. “Most OTR screens are unusable due to COTR (laser heater should fix this in FY2009)” • PRD 1.2-004-r2: “…produces Laudau damping in the bunch compressor chicanes in order to suppress potential micro-bunching instabilities that may be driven by Coherent Synchrotron Radiation (CSR) in the bunch compressors, and Longitudinal Space Charge (LSC) forces in the linac…” • Engineer: Richard F. Boyce

  3. Laser-Heater System

  4. Status • Received and tested four bend magnets, BXH • Completed drawings for the vacuum chamber with OTR bodies and is in MFD • Available in September 2008 • Prints for the alignment stages are complete • Undulator magnets are out for vendor quote • Bids are due back on 6/25/08 • Undulator design are being finalized • Optical components are on order • Start installation in September 2008

  5. BX magnet OTR with photo-diodes 9 period adjustable gap undulator Beam

  6. Summary • Injector Heater design has started and stopped many time • More complicated than original thought • Very tight space requirement • Magnets and optical components purchase orders are in purchasing group • Final design packages are being completed • Undulator magnet installation maybe one month late depending on magnetic measurements • Expect to start installation of vacuum chamber in September 2008

More Related