An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activity 3.7 - Low NOx Machinery ESMA, Efficient Ship Machinery Arrangement Project Summary Report: Low NOx Machinery • ESMA is a joint ship machinery development project by a team of • Kvaerner, ABB and Wärtsilä NSD • Summarised results are from a Report prepared by • Wärtsilä NSD Göran Hellen • October 1999 • under ESMA Activity No. 3.7 Technology H:\MJKU\GHn\Kalvot\ESMA_3.1.PPT 1(7) 8.11.1999 GHn/MJKU

  2. Water Fuel Water Pressure Water Needle 200 - 400 bar and Fuel Needle in the Same Fuel Pressure Injector 1200 - 1800 bar Activity No. 3.7 - Low NOx machinery - Test of Direct Water Injection Typical NOx: < 6 g/kWh Technology H:\MJKU\GHn\Kalvot\F&E\GHn10d.PPT 8.11.1999 GHn/MJKU

  3. 46 Direct Water Injection Fuel Valve g:\wdint-tt\46\kalvo\dirwainj.ppt JJL/SBS 14.9.1998

  4. DWI test on Silja Symphony Engine: Wärtsilä 9L46 ME4 (8145 kW) Tested systems: • Servo system - needle actuated by control oil pressure • test time: 1996 - 5.10.1998 • accumulated running time: 3000 h • Ganser system - needle lift actuated by water pressure • no control oil system needed • test time: 7.10.1998 - 31.8.1999 • accumulated running time: 576 h Technology H:\MJKU\GHn\Kalvot\ESMA_3.7.PPT 2(5) 8.11.1999 GHn/MJKU

  5. Current NOX reduction methods - DWI on M/S Silja Symphony and M/S Silja Serenade • All main engines 2 x 4 x Wärtsilä 9L46 have been converted to Direct Water Injection in June 1999 Technology H:\MJKU\GHn\Kalvot\F&E\GHn11.PPT 4.8.1999 GHn/MJKU

  6. Direct Water Injection on M/S Mistral Technology H:\MJKU\GHn\Kalvot\Mistral.PPT 6/1 GHn/MJKU 3.2.1999

  7. Marine engines: Power Plant engines: Direct Water Injection reference list November -99 Installed/on order: Totally: 186 cylinders Technology H:\MJKU\GHn\Kalvot\DWIAug99.PPT 7/1 GHn/MJKU 7.9.1999 Updated 4.11.1999

  8. Status of DWI on Silja Symphony/Serenade • The DWI systems are certified according to ISO 8178 and • SJÖFS 1997:28 by MTC AB (authorised measurement consultant) • NOx < 6 g/kWh (system sealed by MTC AB) • Accumulated running hours: • Symphony: ~ 1400 h on three main engines • ~ 5100 h on main engine No 4 • Serenade: ~ 1900 h on each main engine (4 engines) Technology H:\MJKU\GHn\Kalvot\ESMA_3.7.PPT 8(5) 8.11.1999 GHn/MJKU

  9. Status of DWI Conclusions: 186 cylinders with DWI installed or on order Commercial product Technology H:\MJKU\GHn\Kalvot\ESMA_3.7.PPT 9(5) 8.11.1999 GHn/MJKU