An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance Work Group UpdateRick Lowther – SRP Operating Practices and Event Analysis Subcommittee Meeting Salt Lake City, UT January 2014

  2. Performance Work Group Meetings • Past • October 8-9, 2013 – Salt Lake City • November 11, 2013 – Webinar • December 12, 2013 - Webinar • Future • January 28-29, 2014 – Salt Lake City • April 15, 2013 – Salt Lake City • July 8, 2013 – Salt Lake City • Unscheduled – Monthly Webinars

  3. PWG Membership • CA/Mexico • Sirajul Chowdhury (CAISO) • James Wells (LADWP) – New member • Canada • Tony Nguyen (BC Hydro) • Desert Southwest • Rick Lowther (SRP) – Chair • John Tolo (TEP) • Northwest • Don Badley (NWPP) • David Kirsch (BPA) • Rocky Mountain • Randy Beckwith (PSCO) • Sean Erickson (WAPA) • At Large • Craig Figart (Avista) • Vacant • Reliability Coordinator • Scott Downey (WECC RC)

  4. Time Error Threshold Increase • PWG proposes an increase in the Western Interconnection’s time error threshold above the current +/- 5 seconds. • Operation of the grid at frequencies other than 60.0 Hz, as during manual time error corrections, places the grid and equipment at risk. • The Eastern interconnection’s time error threshold is +/- 10 seconds.

  5. Time Error Threshold Increase • Last June ERCOT increased their time error threshold from +/- 2 seconds to +/- 30 seconds. • ERCOT terminates manual time error correction when time error is within +/- 27 seconds. • From June through September ERCOT did not perform any manual time error corrections.

  6. Time Error Threshold Increase • Preliminary analysis shows that the number of manual time error corrections can be dramatically reduced by increasing the time error threshold. • Current time error threshold is +/- 5 seconds • 40% reduction with a +/- 10 second threshold • 65% reduction with a +/- 15 second threshold

  7. Time Error Threshold Increase • Analysis statistics for one year beginning in September 2012 • Western Interconnection BAs performed 201 manual time error corrections. • Average slow time error correction lasted 355 minutes. • Average fast time error correction lasted 372 minutes. • 40 % of time error corrections were followed by one in the opposite direction. • 65 % of two consecutive same direction corrections were followed by one or more in the opposite direction.

  8. RBC Field Trial • Two additional BAs, AVA and PSEI, received NERC approval to join the RBC field trial and have been participating for two months.

  9. RBC Impact on WECC Paths • Documentation of an event analysis methodology is underway. • The proposed methodology is similar to that used by the USF Event Analysis Task Force and contains the following analysis criteria. • Unplanned path de-rate % • Scheduled path utilization % • Actual path utilization % • Unscheduled flow % • ACE contribution %

  10. RBC Related Event Analysis • Between April and November of 2013 there were no prolonged frequency events of the nature that could be attributed to RBC. • PWG analyzed 12 SOL exceedance events in closed session in October, November and December. • An unplanned path rating reduction made a significant contribution to the SOL exceedance in 3 events. Unplanned path rating reductions are due to loss of equipment (lines, generation, etc.) that affect ratings immediately prior to the SOL exceedance.

  11. RBC Event Analysis (continued) • Unscheduled flow made a significant contribution to the SOL exceedance in 9 events. Phase shifter operation or generation re-dispatch generally mitigated unscheduled flow in these events. • BA ACE made a significant contribution to the SOL exceedance in 5 events. Two of these required backing thermal generation to balance against increased wind generation. • The RC directed one or more BAs to return ACE to within L10 in 3 events. The PWG determined that the directives were irrelevant to the overloaded path in one of the events.

  12. Tasks in Progress • Complete and publish an SOL event analysis methodology document. • Complete and publish Automatic Time Error Correction (ATEC) FAQ document. • Propose a replacement for L10 which is used for ATEC payback limit in BAL_004_WECC_01 but undefined in new NERC BAL standards. • Propose an increase in the WECC Time Error threshold from +/- 5 seconds to +/- 10 or 15 seconds.

  13. Completed Tasks • Finalized and submitted NERC bubble diagram updates for WECC BAs. • Completed selection of 2013 frequency events for BA frequency response analysis (BAL-003).

  14. Rick Lowther Questions?