280 likes | 426 Views
Applications of High-Resolution Traffic Event Data: Managing Oversaturated Arterials. Dr. Xinkai Wu, Assistant Professor Department of Civil Engineering California State Polytechnic University Pomona. High-Resolution Event Data. Terminal Box. SMART-SIGNAL. DAC.
E N D
Applications of High-Resolution Traffic Event Data: Managing Oversaturated Arterials Dr. Xinkai Wu, Assistant Professor Department of Civil Engineering California State Polytechnic University Pomona ITE Western District 2012 Annual Meeting
High-Resolution Event Data ITE Western District 2012 Annual Meeting
Terminal Box SMART-SIGNAL DAC ITE Western District 2012 Annual Meeting
Trunk Highway 55 and Boone Ave (Golden Valley, MN) ITE Western District 2012 Annual Meeting
Oversaturation Gazis (1963): An oversaturated intersection is defined as one in which the demand exceeds the capacity. Little research has been conducted on the identification and quantification of oversaturated conditions Mostly qualitative and incomplete
Detrimental Effects Temporally, characterized by a residual queue at the end of cycle. Residual vehicles cannot be discharged due to insufficient green splits Creating detrimental effects on the following cycle by occupying a portion of green time. Spatially, characterized by a spill-over from a downstream intersection. Vehicles cannot be discharged even in green phase due to spill-over Creating detrimental effects by reducing useable green time for upstream movements
Oversaturation Severity Index (OSI) • OSI: the ratio between unusable green time and total available green time in a cycle. • Further differentiate OSI into T-OSI and S-OSI. • Temporal dimension (T-OSI) • The “unusable” green: because of the residual queue from the last cycle • Spatial dimension (S-OSI) • The “unusable” green: because of the downstream blockage
Measure T-OSI & S-OSI • T-OSI: • Estimate the length of residual queue at the end of cycle • S-OSI: • Identify spillover • Calculate the reduction of green time of upstream intersections
T-OSI & S-OSI Measure Using High-Resolution Traffic Event Data ITE Western District 2012 Annual Meeting
Queue Length Estimation • Instead of traditional input-output approach, we estimate queue length by taking advantage of queue discharge process • Based on LWR shockwave theory
Queue Length Estimation Utilize the data collected by advance detector Identify Critical Points: A, B, C
Break Point Identification from High-Resolution Detector Data
Field Tests • Test Site: TH55 (6 intersections) • Independently evaluated by Alliant Engineering, Inc. • At Rhode Island Ave. • Three morning peaks (7:00am-9:00am) • Jul. 23rd, 2008 • Occ. 29th, 2008 • Dec. 10th, 2008 ITE Western District 2012 Annual Meeting
SOSI: Identify Queue-over-detector (QOD) Caused by Spillover
S-OSI: Identification of Spillover Identify QOD-II. High-resolution data. ITE Western District 2012 Annual Meeting
Managing Oversaturation: A Simple Forward-Backward Procedure ITE Western District 2012 Annual Meeting
A Simple Forward-Backward Procedure • Based on TOSI and SOSI measurements • Respond and mitigate traffic congestion quickly • Simple and effective • Reactive ITE Western District 2012 Annual Meeting
Problem Setting • N intersections along an oversaturated path • At control period t, decisions are made according to the average TOSI and SOSI values at the control period t-1, i.e., ITE Western District 2012 Annual Meeting
Basic Mitigation Strategies • The TOSI and SOSI values can help identify the causes of arterial traffic congestion • Positive SOSI indicates the spill-back of downstream queue • Positive TOSI indicates that the available green time is insufficient for queue discharge • Therefore for a single intersection, three basic strategies can be applied. ITE Western District 2012 Annual Meeting
TOSI > 0 • Extending green ITE Western District 2012 Annual Meeting
SOSI > 0 • Reducing red at the downstream intersection ITE Western District 2012 Annual Meeting
SOSI > 0 • Gating (Reducing traffic arrivals & giving green to other approaches) ITE Western District 2012 Annual Meeting
Handling Spillover ITE Western District 2012 Annual Meeting
Forward-Backward Procedure • Forward Process (Seeking the available green) • Follow the flow direction to eliminate spillovers and residual queues • Boundary condition ITE Western District 2012 Annual Meeting
Forward-Backward Procedure • Backward Process (Gating or metering) • Follow the opposing flow direction to check the arc capacity • Boundary condition ITE Western District 2012 Annual Meeting
Simulation Test • 22 intersections, Pasadena, CA • Offline control
Simulation Test • TOSI/SOSI Changes Fair Oaks Ave SB Colorado Blvd. WB ITE Western District 2012 Annual Meeting
Future Work • The Fundamental Diagram: Congestion • Safety • Environment • Control ITE Western District 2012 Annual Meeting