The RCU2 ALICE TPC readout electronics consolidation for Run 2

The RCU2 ALICE TPC readout electronics consolidation for Run 2. Johan Alme Bergen University College, Norway on behalf of the ALICE-TPC collaboration TWEPP 2013, Perugia , Italy 23rd – 27th September 2013. ALICE detector. TPC detector. Present ALICE TPC Readout Electronics.

livia
Download Presentation

The RCU2 ALICE TPC readout electronics consolidation for Run 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The RCU2 ALICE TPC readout electronics consolidation for Run 2 Johan Alme Bergen University College, Norway on behalf of the ALICE-TPC collaboration TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  2. ALICE detector TPC detector Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  3. Present ALICE TPC Readout Electronics • TPC is dividedinto 2 x 18 Sectors: • 216 Readout Control Units (RCUs) • 4356 Front End Cards (FECs) • The RCU is a complex system: • RCU Motherboard • Detector Control System (DCS) Board • Embedded Linux platform • SourceInterfaceUnitCard (SIU) • In total 3 PCBswith 4 FPGAs • 2 branches per RCU of a multidropparallel bus • 18 – 25 FECs per RCU • dependingonposition • Peakbandwidth 200 MB/s Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  4. ALICE Run 2 Scenario • Run 2 is theperiodbetween Long Shutdown 1 (LS1) and Long Shutdown 2 (LS2) • Planned start of Run 2: January 2015 • Run 2 will have higherinteraction rates and highertrackdensities • Expectedvalues for Pb-Pbcollisions: • Peakluminocity: 1 – 4 x 1027 cm-2s-1 • 8 – 30 kHz interaction rate • Current ALICE design value: 8 kHz • 40% more data for centralevents • Eventsizesincrease from 65 MB to 90MB • Higher readout speed needed • Higherradiationload => more Single EventUpsets Lowmultiplicityevent from Run 1 Highmultiplicityevent is completelycrowded Run 2 will have evenhighermultiplicity Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  5. Motivation for Upgrade (I) • Data Rate Limitations: • Current bottleneck: Bandwidth of the data bus • ≤ 200 MB/s per branch • Large (fixed) overhead - addressing and header • Bandwidth of optical detector data link (DDL) • 160 MB/s • Stability Limitations (Run 1 experiences): • End-Of-Run situations caused by radiation related errors in the TPC electronics have been seen • DCS board failures frequent – few per fill • Not “mission critical” Two read-out modes: sparse and full read-out. Read-out time for full TPC is defined by the slowest read-out partition Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  6. Motivation for Upgrade (II) • Main message: • The readout performance is limited by the parallel bus architecture • This reduces the expected performance for Run 2 • Conclusion: We need a faster data readout than what the current solution provides! • Both main FPGAs on the RCU has a relatively high SEU susceptibility and almost no design-level protection • Not enough resources in the FPGAs to implement it • Conclusion: With even the higher luminosity in Run 2 we need an improved radiation tolerance for the readout chain! Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  7. RCU2The ALICE TPC Consolidation Effort • Constraints: • Time-budget • Reuse all exisitinginterfaces • TTC fiber • DAQ fiber • Ethernet cable • Power cable • GTL bus • No change to form-factor and cooling • Improveradiationtolerance • Increase data rate to meet Run2 conditions • Solution – RCU2: • One single radiation tolerant FLASH based SmartFusion2 FPGA • FPGA design composed of a few building blocks largely based on existing modules • Backplanes - Double the number of readout branches to 4 branches • Nice to have functionality: Radiation Monitor Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  8. Branch Partitioning • There are 6 readout partitions per TPC sector: • 6 different sizes of backplanes • Two wings per partition • Each wing is electrically split into two branches each with new branch naming convention • A A_inner (AI) | A_outer (AO) • B  B_inner (BI) | B_outer (BO) • Depending on partition – various number of FECs per branch • RP0: 5 + 4 + 4 + 5 • RP1: 6 + 6 + 6 + 7 • RP2: 5 + 4 + 4 + 5 • RP3-RP5: 5 + 5 + 5 + 5 RP5 RP4 RP3 RP2 RP1 RP0 Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  9. RCU2 Backplanes • Two options: • Adapter cardsolution • All in One solution • Pros and Cons are considered for both options • Prototypes will be produced for both options and decision taken afterwards. • Location of connectors between RCU2 and branches are fixed: • Backward compatible with current backplanes Present backplanes Electricalsplitof backplanes Adapter cardsolution All in One solution Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  10. RCU2 Hardware Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  11. Microsemi Smartfusion2 • The Smartfusion2 M2S050-FG896 provides: • Radiation Tolerant Flash Cells • SECDED encoded DDR RAM interface • MicrocontrollerSubsystemwith ARM Cortex M3 and usefulperipherals • Platform for Embedded Linux • 5 Gb/s operation in custom working mode on one lane of the SERDESIF for DDL2* • Enough resources to have TMR on vital parts of the logic * Not availablebefore end of 2013 Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  12. RCU2 Hardware • Pictures shows first draft of RCU2 layout • Importantpoints: • Backwardcompatibleregardingplacementofconnectors • Reuseofcooling plates • Constraintsplacementregarding heat dissipation and connector locations • Power estimates • Typicalvalues (currentconsumption): • Ext 4V3: ~1.2A • Ext 3V3: ~4.3A • The GTL bus drivers areby far the most power-hungrycomponentsontheboard RCU2 front RCU2 back Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  13. RadMon – Radiation Monitor • On the present RCU there is an additional FPGA thatcounts and correctsSEUs in theconfigurationmemory in themain FPGA • This acts as a radiation monitor! • This is an interesting feature to keep for the RCU2: • Additional SRAM memory and Microsemi proASIC3 250 added to the RCU2 • Not enoughuser-IOsonthe smartFusion2 for this feature • Low risk – design alreadydone and proven* • Cypress SRAM – same as used for the latest LHC RadMondevices • Extensively characterized in various beams (n, p, mixed) and compared/benchmarked to FLUKA MC simulations * Arild Velure ”Anvendelse av FPGA som preprosessor i en SRAM-basert nøytrondetektor”, Master Thesis 2011 Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  14. TTC interface • TTC = Timing, Trigger and Control • System responsible for distributionof system clock and triggers • One ofthechallengesoftheupgrade is thattheTTCrx ASIC is outofstock • This is theTrigger/Clockreceiver chip for the Front end Electronics • No provenradiation tolerant TTCrxreplacementexist! • Solution: • HFBR 2316T OpticalReceiver (suggested by TTC group) • MAX3748 Post limitingamplifier • Clock Data Recoveryinternally in FPGA • Challenge: The clock signal must be recoveredwithhighaccuracy! • This has beentested and verified in the lab withreal-lifesetup • Radiationtolerance not yetproven • Involves simple componentswithnoconfiguration registers – Successverylikely! • Makes reuseofexisting FPGA modulesveryeasy Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  15. RCU2 FPGA design • The ARM Cortex M3 hosts an Embedded Linux platform • New drivers areneeded • Most software can be reused • The FPGA PLD design is heavilybasedonthe present RCU design with a fewnew features • New readout scheme: • Orderingofchannels by pads & rows • Higherclock speed • Pause and recoverimplementation • Discardof Junk data • Important: Improveradiationtolerance Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  16. Readout Scheme and Data Ordering (I) • One rowof sensor padsarespread over all 4 branches • Data pre-prossesingdemandsthat data is shipedordered by padrow • Needed to findchargeclustersalongtracks in the HLT/DAQ system • A chunkof data is defined: • Numberofchannelsbelonging to same padrow and branchordered by pad location • The order ofthechannelswithin a chunk is configurable to match pad location Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  17. Readout Scheme and Data Ordering (II) • Given averageeventsizeestimations for 0-10% centralevents (Run 2): • Max averagesizeofonechunk is ~35 kBit • Readout partition 1 • Highestchanneldensity • Largest data volume • Bandwidth per branch: ~1.0 Gbit/s • Min. Readout speed per FIFO: 32 bit @ 125 MHz • Bandwidth RCU2 DDL2 interface: 4.0 Gbit/s • Given internalmemoryresources: • Branch FIFO capacity: 4.7 averagemaxsizechunks • Simulationsareplanned to getexactfigures Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  18. IrradiationCampaigns • Component testing will be done at Oslo Cyclotron (in-house) • ~30 MeV protons • 1 slot in October & 3 slots in November • Wecan not test all componentsindividually (No time!) • A list have beenmadewithcomponentswefind it critical to test as early as possible • This is essentially ”new” componentsthatwedon’t have experiencewith, or • Components in critical parts ofthe design (i.e. TTC chain) • Testing ofthe smartFusion2 • Effectsof Single Event Transients can be a problem at higherclock speeds* • RCU2 system test in Uppsala or PSI earlynextyear • 180 MeV Protons & Neutronspossible • Beamtime will be requestedwhenwearecertain to reachthemilestone * https://indico.cern.ch/getFile.py/access?resId=0&materialId=slides&confId=152527 Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  19. Summary & Outlook • The proposed upgrade would enable ALICE to collect a significant larger amount of events in the central barrel at a moderate cost • Estimated cost: ~455 kCHF • The read-out time for TPC events is estimated to be improved by a factor of up to 2.6 • TPC will conform to the running scenario envisaged for Run 2 of ALICE • SystemC simulations are planned to confirm this figure • Radiation tolerance will be improved • Biggest challenge for the project is the tight time-budget constraint • At time of writing we are approximately on schedule Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013

  20. Thanks for Listening • RCU2 people(in noparticular order): Johan Alme (johan.alme@hib.no) – Bergen University College, Norway Lars Bratrud, Jørgen Lien, Rune Langøy – Vestfold University College, Norway Ketil Røed, Chengxin Zhao – University of Oslo, Norway Kjetil Ullaland, Dieter Röhrich, Shiming Yang, Arild Velure, Inge Nikolai Torsvik, Christian Torgersen – University of Bergen, Norway Attiq Ur Rehman – COMSATS, Islamabad, Pakistan Tivadar Kiss, Ernö David – Cerntech, Budapest, Hungary Christian Lippman– GSI Darmstadt, Germany Anders Oskarsson, Peter Christiansen, Lennart Osterman – University of Lund, Sweded Harald Appelshäuser, Torsten Alt , Attilio Tarantola – Goethe University Frankfurt, Germany Fillipo Costa – CERN, Switzerland Taku Gunji – University of Tokyo, Japan Johan Alme - TWEPP 2013, Perugia, Italy 23rd – 27th September 2013