CDR Status information. Much good progress by the authors since last meeting Today’s ( 08-July 2011) state: 47 contributions needed 40 received - 23 as draft only - 17 as “final” submission http:// project-clic-cdr.web.cern.ch/project-CLIC-CDR

livvy
Download Presentation

CDR Status information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDR Status information • Much good progress by the authors since last meeting • Today’s (08-July 2011) state: 47 contributions needed40received - 23 as draft only - 17 as “final” submission • http://project-clic-cdr.web.cern.ch/project-CLIC-CDR • Can reasonably expect 4 more (draft) contributions in July. • IEB (Internal Editorial board) relaunched. • Only “received” contributions are compiled into the draft CDR.We wish to get 5...10 authors, who convert in July their draft into a submission. • Most things agreed for the front-page layout. All volumes will have similar appearance. Details (=matter of taste) still to be discussed. • Collection of CDR “signatories” through a web-page will be tested in August and will be active for the period September-November • Expect final document in time for December 2011 Council.

  2. News from CTC WGs • As defined: not complete; only from those who are there and were something exciting has happened... • we have to take the workpackages exercise serious • technical news on:Two beam test module(Pre)alignment • MDI G. Riddone

  3. Two-beam test module project (1) New organization of B169. Test modules in a dedicated room Installation of supporting/positioning system for first two modules completed – validation tests under way G. Riddone

  4. Two-beam test module project (2) Several component to handle: Logistics and database DB quad mock-up Load mock-up Pre-assembly of AS mock-ups First rf structure mock-ups ready by end of July G. Riddone

  5. Test modules: status OK OK OK Under progress

  6. Test modules : last results Installation & validation of alignment systems • Repeatibility in the installation of cWPS sensors on their interfaces: < 1 μm • Repeatibility in the installation of inclinometers on their interfaces : < 2 μrad Validation of linear actuators on 1 DOF test bench (M. Sosin) • Maximum backlash: 4 μm • Repeatability < 1.5 μm • Resolution < 0.2 μm

  7. MB quad mock-up (with cam movers) Mock-up installed in 927 M. Anastaspoulos, R. Leuxe • Measurements concerning Eigen frequencies of the interface plate took place last Tuesday & Wednesday • Pre-alignment sensors to be installed this Friday • First tests concerning resolution over the whole range & 5DOF will take place next week • Design under progress concerning a smaller cam mover (for module type 1)

  8. Geodesy studies In collaboration with ETHZ, a deflectometer was installed in 839 (12 m long) Deflectometer: relative measurements of deflection of vertical in tunnel N. Chritin First results show that inclinometer installed is not adapted and will be replaced

  9. MDI • Good progress on 3 D anti-solenoid simulations • Progress on stabilization (CERN and SYMME) • Progress on muon background simulations • First parts of QD0 prototype are at CERN (next slide) G. Riddone

  10. Final Focus “QD0” prototype procurement: Michele Modena