130 likes | 250 Views
Laboratory Pilots/Deployment. June 26, 2012. Participants. Production/Deployment Project P articipants Allscripts (EHR) Athenahealth (EHR) Cerner (EHR/LIS/HIE) OPTUMInsight (HIE/EHR) RML (LIS) LabCorp (LIS) Halfpenny Technologies (Integrator). Pilot I Project P articipants
E N D
Laboratory Pilots/Deployment June 26, 2012
Participants Production/Deployment Project Participants • Allscripts (EHR) • Athenahealth (EHR) • Cerner (EHR/LIS/HIE) • OPTUMInsight (HIE/EHR) • RML (LIS) • LabCorp (LIS) • Halfpenny Technologies (Integrator) Pilot I Project Participants • Atlas Development • CAP • Halfpenny Technologies • KHIE • LabLynx Coordination of Effort • Validation Suite • Vocabulary Group • Implementation Guide Analysis • LRI/LOI/eDOS Workgroups • Support Team Pilot II Project Participants Conversations • Lab System and EHR Vendor (2) • Lab System Vendor (2) • EHR Vendor (3) • Commercial Laboratories (2) • Provider Based Commercial Labs (3)
Agenda Updates on Laboratory Activity • LRI – DSTU comment review • LOI – Status • eDOS – Status • Validation Suite update • Vocabulary Workgroup update • Next Steps
LRI • Finishing response to DSTU comments • Expected completion next couple of weeks • Need feedback from Pilots WG regarding: • length/conformance length • 1.7.3 re “snapshot” • TQ1/TQ2 RE/O
LOI / eDOS Status • LOI • Charter complete • Use Case Consensus Review • Alignment in process • Vocabulary work in process • eDOS • Charter / Use Case status
Laboratory PilotsCommunity Options for Piloting Option One: Individual Initiative Pilots aka Pilots I • Point of Contact: Bob Dieterle • Details: Participants will pilot LRI LRI LOI eDOS Option Two: “Pilots II” • Point of Contact: Bob Dieterle & Freida Hall • Details: Participants will pilot LRI AND LOI with the option to additionally pilot eDOS LRI LOI eDOS Option Three: eDOS Only Pilots • Point of Contact: Freida Hall • Details: Participants will pilot eDOS LRI LOI eDOS
Validation Suite • LRI DSTU update to be completed by July 7th. • LRI to be published to Federal Register by July 15th • Validation Suite Incorporation of updated DSTU LRI by end of July • Coordination of effort with Public Health • Initial meeting TBD • Review LRI validation suite and applicable test list • Solicit help from participants
Interaction between Pilots and S&I • Provide feedback on any implementation, deployment, support issues with IGs • Provide feedback on any implementation, deployment, support suggestions to improve adoption/use of the IG by other entities. • Provide feedback on any Validation Suite gaps, issues and additional requirements • During initial production deployment, participants are strongly encouraged to report scope of use of IG compliant interfaces (e.g. options supported, tests, LOINC codes utilized, SNOMED CT codes used, UCUM used
Needed from all participants • Testers and feedback for current version of Validation Suite tool http://lri.sipilotdevelopment.org/lri-dstu/ • Volunteers for 1-on-1 WebEx testing • Especially EHR systems • Validation Suite for reconciled DSTU version to be ready end of July 2012
Ecosystem • Each participant will propose a complete ecosystem for reference implementation purposes • The recommended ecosystem should consist of a laboratory, LIS/interface vendor (may be in-house effort) , provider organization, and EHR vendor • To the extent third parties integrators are required to create and/or support the reference implementation, they will be considered part of the proposed ecosystem • If participants are unable to assemble the entire ecosystem, Laboratory Pilot/Deployment leadership will assist in making introductions where possible
Laboratory Results Interface (LRI) • Each participant shall develop/implement and test a production or pre-production interface compliant with the Draft Standard for Trial Use (DSTU) version of the LRI IG for the exchange of laboratory results between the LIS and EHR. • Utilize the online validation suite to test all supported use cases applicable to the specific ecosystem. • Each laboratory/LIS and EHR should participate in an S&I Laboratory Pilot coordinated virtual interoperability forum to be established among the Laboratory Pilot II participants. • The resulting pre-productions LRI implementations are expected to be taken to production use by the end of 2012 and where possible rolled out to additional implementations in early 2013.
Next Steps / Questions • Next Steps • Continue recruiting Production/Deployment participants • Work with Public Health on expanded scenarios for validation suite • Establish ecosystems for production/deployment • Ask for help if need partner • Schedule • Calls for coordination every other week at same time next call 7/10 • Continue work with Validation Suite • Continue participation in LOI and compendium effort based on LOI calendar • For questions, please feel free to contact • Bob Dieterle: rdieterle@enablecare.us