1 / 38

e-Infrastructure for Large-Scale Social Simulation

e-Infrastructure for Large-Scale Social Simulation. Mark Birkin Andy Turner. Simulation Infrastructure. Background Features Capabilities Current developments, plans and priorities. Background. Aim :

locke
Download Presentation

e-Infrastructure for Large-Scale Social Simulation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. e-Infrastructure for Large-Scale Social Simulation Mark Birkin Andy Turner

  2. Simulation Infrastructure • Background • Features • Capabilities • Current developments, plans and priorities

  3. Background • Aim: • Exploring the extent to which it is possible to develop robust representations (models) of cities and regions: • - as they are • - as they will be • - as they could be

  4. Background • Objectives • Realistic representations of cities • Medium-term projections • Changing behaviours and activity patterns Service utilisation Resource planning Scenario-based forecasting • Technology interfaces

  5. Background • The Population Reconstruction Model (PRM) Deprivation in Leeds, 2001

  6. Background • The Dynamic Model: Elderly Population 2031 2001

  7. Background • The Scenario Model: Air Quality 2001 2031 Traffic Intensity * 2015 * Traffic Intensity=Traffic load/Road capacity

  8. Background Population and average speed changes in Leeds from 2001 to 2031

  9. Features (1) • A formidable requirement for processing and storage: • PRM takes anything from several minutes to several days depending on the choice of algorithm and spatial extent • a typical set of forecasts • 800,000 individuals • 30 characteristics • 30 time periods • 20 scenarios • now duplicate for the ‘other’ 58 million!

  10. Features (2) • An array of data sources which are potentially distributed: • Small Area Statistics • Sample of Anonymised Records • Special Migration Statistics • ONS Vital Statistics • BHPS • General Household Survey • Health Survey for England • Map boundaries and other spatial datasets • and so on...

  11. Features (3) • Requires a capability for interrogation of data/ models/ scenarios and visualisation of the resulting outputs: Map Chart Table Report

  12. Features • Architecture

  13. Features • Service-Oriented Architecture

  14. Capabilities

  15. Dynamic Spatial Microsimulation

  16. e-Social Science

  17. Reports

  18. Plans and Prospects • National e-Infrastructure for Spatial Simulation (NeISS) • 1/4/09-31/3/12, 18 man years, £2 million budget • JISC Information Environment Programme: • “Developing e-Infrastructure to support research disciplines” • - production-level simulation tools and services • - social simulation exemplars • - integration of tools and respositories • - establish standards and frameworks • - work with stakeholders: raise awareness, build capacity, provide new services

  19. Current Plans

  20. WP - Simulation

  21. WP - Composition

  22. WP - Architecture

  23. WP - Deployment

  24. Plug-and-play architecture? Workflow Research Object Portlet

  25. NeISS: Letters of Support • Partners: Leeds, Manchester, Southampton, UCL, Glasgow, STFC, Stirling • E-Infrastructure service providers and stakeholders: NGS; NeSC; CCSR; Mimas; ESRC; UKRDS; Census Programme; UKOLN; EGI • User community: NCRM; Autodesk; Demographic Decisions; COMPASS; CGS; Newcastle School of Civil Engineering and Geosciences; Agriculture and Agri-food Canada; Liverpool School of Geography; Reading School of Systems Engineering; Royal Town Planning Institute; Macaulay Institute; AGI; EUAsiaGrid

  26. NeISS Community • Three tiers: • end-users (naïve) • research users (sophisticated) • contributors (“power users”) • Lifecycle model?

  27. Questions • What other simulations can we add to the portfolio? • Is it possible to build a community of both users and developers for social simulation? • What additional functions and services can be provided to support a social services infrastructure? • What are key datasets for the simulation community? • How important is computational grunt as a constraint? Are there other bottlenecks to simulation modelling which might be overcome through an e-infrastructure?

  28. Conclusions • NCeSS programme has introduced a platform and elements for the establishment of a research infrastructure for social simulation • NeISS project will provide the resources to implement a ‘production level’ version of these technologies • The project will stand or fall by its ability to engage with the social simulation research community • - your support is crucially important!!

  29. References • Birkin M, Townend P, Turner A, Wu B, Xu J (2007) An Architecture for Social Simulation Models to Support Spatial Planning • http://www.ncess.ac.uk/events/conference/2007/papers/paper214.pdf • (Social Science Computing Review, in press). • Townend P, Xu J, Birkin M, Turner A, Wu B (2008) Modelling and Simulation for e-Social Science Through the Use of Service-Orientation and Web 2.0 Technologies • http://www.ncess.ac.uk/events/conference/programme/workshop1/?ref=/programme/fri/4ctownend.htm • (Philosophical Transactions of the Royal Society, in press)

More Related