460 likes | 1.37k Views
PETE 411 Well Drilling. Lesson 3 The Rig - Drilling Equipment. Contents . Rig Pumps Solids Control Equipment Air Drilling The Rotary System The Swivel The Well Control System The Well Monitoring System Offshore Drilling. Assignments:. READ: ADE Ch. 1, to p.30
E N D
PETE 411Well Drilling Lesson 3 The Rig - Drilling Equipment
Contents • Rig Pumps • Solids Control Equipment • Air Drilling • The Rotary System • The Swivel • The Well Control System • The Well Monitoring System • Offshore Drilling
Assignments: READ: ADE Ch. 1, to p.30 HW #1:ADE 1.1, 1.2, 1.3 Due Monday, Sept. 9, 2002 at the beginning of class NOTE: Answers in book are not always correct...
Schematic of Rig Circulating System for liquid drilling fluid
Example 1.3 Compute the pump factor in units of barrels per stroke for a double-acting duplex pump having: 6.5-inch liners (dL) 2.5 inch rods (dr) 18-inch strokes (LS) and a volumetric efficiency of 90%. (EV)
Solution: The pump factor for a duplex pump can be determined using Equation 1.10
Recall: There are 231 in.3 inan U. S. gallon and 42 U.S. gallons in a U.S. barrel. Thus converting to the desired field units yields: 1991 in.3/stroke * gal/231 in.3 * bbl/42 gal. = 0.2052 bbl/stroke. Thus: Pump Factor = 0.2052 bbl/stroke
Example: Pump Rate = Pump Factor * Strokes/min = 0.09442 = 7.554 bbl/min = 317.3 gal/min Pump Rate = 317 gal/min
Hydrocyclone • desander • desilter * No moving parts * Low cost * Pressure drop * Diameter
Decanting Centrifuge Use?
Fig. 1.34 Cutaway View of Swivel * Seals * Bearings ROTATING
PIN BOX TJ Shoulder Fig. 1.38 Cutaway View and Dimensions for Example Tool Joint
Fig. 1.39 Stabilizer * Keeps pipe in center of hole * Aids in drilling straight hole * Prolongs bit life
Fig. 1.41 Kick Detection During Drilling Operations 3 GAIN IN PIT VOLUME EQUAL TO KICK VOLUME KICK 2 1
Fig. 1.46 Remote Control Panel for operating Blowout Preventers CHOKE What to do if KICK occurs?
DP TJ DC OH Press Fig. 1.44 Annular Blowout Preventer
SHEAR / BLIND RAM ASSEMBLY Ram Blowout Preventer - cont’d
Fig. 1.51 High-Pressure Circulating System for Well Control Operations Kick Keep BHP const.
OFFSHORE DRILLING Fig. 1.57 Spread Mooring Systems
Fig. 1.59 Operation of a Heave Compensator
Typical Casing Strings Water Level Depth Seafloor Below ML Conductor pile 36” 30” 200’ Conductor Casing 26” 20” 1000’ Surface Casing 17 1/2” 13 3/8”4000’ Hole Csg. Depth
Some Typical Casing Strings DepthBelow ML Conductor pile 36” 30” 200’ Conductor Casing 26” 20” 1000’ Surface Casing 17 1/2” 13 3/8”4000’ Hole Csg. Depth
What is the capacity of 10,000 ft of 5” OD, 19.50 lb/ft drillpipe? Capacity = Area * Length Area = p/4 d2 = p/4 * 4.2762 = 14.36 in2 Length = 10,000 ft = 120,000 in Capacity = 14.36 *120,000 in3 /(231*42 in3 /bbl) Capacity = 177.6 bbls
What is the displacement of 10,000 ft of 5” OD, 19.50 lb/ft drillpipe? Capacity = Area * Length Area = p /4 (od2 - id2 ) = p /4 * (52 - 4.2762) = 5.275 in2 Length = 10,000 ft = 120,000 in Displ. = 5.276 * 120,000 in3 /(231 * 42 in3 /bbl) Displacement = ? Bbls