SACEA Fatal Risk Std’s Update Northern Regional Meeting

SACEA Fatal Risk Std’s Update Northern Regional Meeting. Paul Redelinghuys UG Maintenance Manager (Khutala Colliery) 7 May 2011. Replace with a photograph. Topics. Background Task Team Scope of Fatal Risk Standard (FRS) Fatal Risk Standards (FRS) Perception

loki
Download Presentation

SACEA Fatal Risk Std’s Update Northern Regional Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SACEA Fatal Risk Std’s UpdateNorthern Regional Meeting Paul Redelinghuys UG Maintenance Manager (Khutala Colliery) 7 May 2011 Replace with a photograph

  2. Topics • Background • Task Team • Scope of Fatal Risk Standard (FRS) • Fatal Risk Standards (FRS) Perception • Brief Overview of these Fatal Risk Standards • Light Vehicles • Heavy Duty Vehicles • Livery • Way Forward • Closure

  3. Background • SACMA & SACEA Initiative to address industry requirement on the Fatal Risk Standards (FRS). • Alignment of Fatal Risk Standards (FRS) attempts within Colliery Industry, • Industry Confusion with regards to contractors compliance requirements, • Educationof key stakeholders about FRS requirements, • Best Practice Guideline for all Collieries where Fatal Risk Standards have not been adopted.

  4. Task Team • BECSA Paul Redelinghuys • XSTRATA Buks Loock • Anglo American Mike Thuesen

  5. Scope of FRS • Light Vehicles (LV’s) • A Light Vehicle is a vehicle that has a gross vehicle weight that does not exceed 4500kg and is/can be registered for use on a public road. • Heavy Vehicles (HDV’s) • A Heavy Delivery Vehicle (HDV) is a vehicle that has a gross vehicle weight that exceeds 4500kg and is/can be registered for use on a public road. • Busses • A Heavy Delivery Vehicle (HDV) is a vehicle that has a gross vehicle weight that exceeds 4500kg and is/can be registered for use on a public road. • Livery • The Identification Signage which will be required on mobile equipment.

  6. Fatal Risk Standards Perception Buildmax FRCP Presentation

  7. Brief Overview: LV’s • Vehicle Classification • Class A – Vehicles with access to the mines. • Class B – Vehicles with access to operational areas. • Class C – Interaction with EME/SME’s. • FRS Requirements i.e.: • Seatbelt, • Roll Over Protection Structures,

  8. Brief Overview: LV’s • FRS Requirements i.e.: • Positive Communication, • Airbag Requirements, • Buggy Whip, • Flashing Lights, • Seat mounting Requirements, • First Aid Kit Requirements, • Chock Blocks, • Fire Suppression Requirements, • Guarding Requirements, • Tire Type Requirements, • Advances in Technology • IVMS systems for tracking purpose, • Collision Avoidance Requirements • etc.

  9. Brief Overview: HDV’s • Vehicle Classification • Class A – Vehicles with access to the mines. • Class B – Vehicles with access to operational areas. • Class C – Interaction with EME/SME’s.

  10. Brief Overview: HDV’s • FRS Requirements i.e.: • Lockout Requirements, • Adequate Walkways, • 3 – Point Contact • Chock Blocks, • Rear Under run protection, • ROPS, • Truck mounted Crane requirements, • Advances in Technology: • IVMS systems for tracking purpose, • Collision Avoidance Requirements • etc.

  11. Brief Overview: Livery

  12. Brief Overview: Livery

  13. Way Forward • Draft Alignment FRS developed for: • Light Vehicles (LV’s), • Heavy Vehicles (HDV’s), • Busses, & • Livery. • Alignment Session planned 24 May 2011 with following participants: • BECSA Paul Redelinghuys • XSTRATA Buks Loock • Anglo American Mike Thuesen • EXXARO Lou Kilian/Louis Turvey • SASOL Louis Botha • Reach Agreement for Final Draft by End July 2011 • Communication of Final FRS Guideline once agreement reached

  14. Thank you