1 / 6

Research Needs Assessment for Micropiles: The Past, Present and Future

Research Needs Assessment for Micropiles: The Past, Present and Future. Gary M. Weinstein Research Fellow Polytechnic University Brooklyn, NY. IWM 2003. Research Needs Identified in IWM 2002 Venice. Design. FOREVER. Research. - Must be applied

lona
Download Presentation

Research Needs Assessment for Micropiles: The Past, Present and Future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Research Needs Assessmentfor Micropiles: The Past, Present and Future Gary M. Weinstein Research Fellow Polytechnic University Brooklyn, NY IWM 2003

  2. Research Needs Identified in IWM 2002 Venice Design FOREVER Research - Must be applied - Utilization of WSU, State Pooled Fund, PANYNJ for research • - Understanding of Case 2 micropiles with respect to seismic design • - Design issues with battered micropiles • - Connection details • - Development of ductility and fixity conditions for Case 2 systems • - Global stiffness prediction • - Lateral/seismic load transfer • - Certainty and risk assessment issues & costs Structural Geotechnical - Connection Details - Bending Moment Effects - Overall Structural Performance - S-P-S interaction - Scale effects - Group effects - Pile spacing/ geometry - Slenderness ratio/ construction method effects on system performance - Standardize FEA/FD - Dynamic – Load sharing and SSI design - CPT – construction effects on soil Economics - Are Case 2 systems viable? QA/QC - Test beds - PDA - CPT data on soil Design Standard for Case 2 Systems Other - Website / e-mail - Database / (skin friction and construction methods) Definition of a Group and Network? Definition of a Micropile? Stop and Think Before We Go Any Further What is the Framework for Implementation? Note: Text in yellow denotes research needs addressed per the MICROFOR proposal

  3. Drilled and Grouted Micropiles Research Needs Assessment (Draft Final Report) Contract No. FHWA-DTFH 61-93-C-00128 July, 1995 Revisited - Research needs foreseen in original FHWA technical proposal (Sept., 1993) - Research needs as identified in State-of-Practice Review - Overview of FOREVER research plan - Proposal to conduct an integrated American micropile research program - Consolidated research needs assessment

  4. Framework & Updated RNA – Case Study MICROFOR Research & Integration Flow Chart

  5. Implementation – Case Study A Government-Industry-University Partnership for Research, Development, Testing and Performance Monitoring of Micropile Network Systems for Highway & Civil Infrastructure Applications

  6. Dedicated to the Vision of Dr. Fernando Lizzi

More Related