SPP FIELDS Updated block diagrams Fault Tolerant Design

SPP FIELDS Updated block diagrams Fault Tolerant Design. Fault Tolerance Requirement.

lonato
Download Presentation

SPP FIELDS Updated block diagrams Fault Tolerant Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPP FIELDS Updated block diagrams Fault Tolerant Design

  2. Fault Tolerance Requirement • “Solar Probe Plus will achieve mission success at the end of prime mission by returning no less than 64 Gb of science data composed of at least 7 out of 9 of the required measurements (4.1.2.3 -4.1.2.11) collected during 150 hours below 20 Rs, including no less than 5 hours below 10 Rs. “ • Since FIELDS measurements represent 4 of the 9, any single point failure in FIELDS is a mission critical failure. FIELDS threshold mission science measurements:

  3. FIELDS fault tolerant design “Sys-6”, TDS serves double duty, serves as DCB for Side 2

  4. Capabilities retained • Side 1 failure, Side 2 carries on FIELDS operations • Inboard MAG • Produces magnetic field vectors, 3 axes, up to 293 Sa/s • TDS • Can deliver DC electric field vectors, DC to 1MSa/s, one axis (V3,V4) • Can deliver electric field spectra, up to 1MHz BW, one axis (V3,V4) • Requires some re-programming of TDS function • Total loss: • SCM • QTN and Radio Emissions • Side 2 failure, Side 1 carries on FIELDS operations • Outboard MAG • Produces magnetic field vectors, 3 axes, up to 293 Sa/s • DFB • Produces electric field vectors and spectra, DC to 150 kSa/s, two axes (V1,V2) and V5 • Produces SCM vectors and spectra, DC to 150kSa/s, 3 axes • RFS/DCB • Produces QTN spectra, 10kHz to 2.5MHz BW • Produces Radio Emission spectra, 1MHz to ~19MHz BW • Total loss: • TDS

  5. Block Diagram Jun 4, 2013

  6. MEP Stack Up • Side 1 • LNPS1 • MAGo (Outboard) • DCB/RFS • AEB1 • DFB • Side 2 • LNPS2 • MAGi (Inboard) • TDS • AEB2 • Each slice is bolted to S/C Panel

  7. Power interface detail LNPS1

  8. Power interface detail LNPS2

  9. Actuator Interface

  10. Level 3 Requirement - Clarification • Current L3 max field intensity: 5V/m at 20kHz • Applied to V5 measurements implies signals that are 10s Volts amplitude • Not met with current design of V5 preamp • Should we clarify this requirement as N/A for Eparallel? Current Level 3 Requirement for EFI…

  11. SCM noise floor question • A request from DFB to SCM team: • “recommended that the sensitivity of the complete SCM including Preamp be verified before moving forward on the DFB design.” • Meeting SCM noise floor L3 requirement would more power • L3 requirement is 10X the published SCM noise floor • Noise floor analysis of SCM preamp, based on • LT1352 preamp LF output stage, noise referred to its input: 14nV/sqrt(Hz) Indicated gain implies ~450nV/sqrt(Hz) at the output • SCM-LF noise floor (at 3kHz): 1E-5 nT/sqrt(Hz) converts to 26nV/sqrt(Hz) • Assuming conversion factor of 2.6mV/nT