An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Silent InspectorICHDMG Report • Review – Technical and Business Operation • Update on Implementation status • Current Issues

  2. SI Review - FAQ • What does it do? • How does it work? • Who does what? • What do you get?

  3. What Does it Do? • Reports dredge measured parameters that describe hopper dredge operations • Analyzes the data to guess what the dredge is doing – dredging, turning, sailing, dumping. • Stores, finds, reports, & plots data

  4. Hopper SI Measurements

  5. Implementation Principles • Partnership with Dredging Industry • Report the Contractor’s Data • Performance based specification • Rigorous Data Quality Assurance

  6. SILENT INSPECTOR District Operations ? Environmental ? Load/Daily Reports RE & QARs ? Email Send Data Explorer – eGIS Specifications National Silent Inspector Database Contractor Email Receive Dredges Hopper GlobalStar ? Scows ? Email Pipeline ? Internet Email / Flash disk Mechanical ?

  7. How does it work? On the dredge …

  8. Who Does What? • Corps provide a standard performance specification • Dredge owner designs system, operates, and provides all instrumentation and computers • Corps provides SI software for the ARCO computer

  9. Silent Inspector Business Plan • National Always-On automated dredge monitoring • National Operations Support team • Evolve with 2012 Team of Teams • Operations Improvements • Include smaller contracts & districts • Transition support from R&D • Decision Support • eGIS integration

  10. What Do You Get? • Automatic State Determination • Dredging, Turning, Sailing, Dumping, etc. • Production • Position

  11. Reports – Details

  12. Reports - Summary

  13. Reports - Spatial

  14. GIS Track Plot Review

  15. Using the Map Interface Zoom To All Plotted Points

  16. Track Plot Review

  17. Features of the National Plan • Expanded Project Monitoring • Include Regulatory • Expanded Dredge types • Simplify Dredge SI Certification • Centralized Support under Operations • Regional & National Stakeholders

  18. Expanded Plant • All Hoppers • Include all Government Hoppers • All Scows • Minimum of Tracking Profile • Monitoring or TDS Profile specified by ODMP • Pipelines > 30”, + Goetz & Oregon • Mechanical dredges TBD

  19. Schedule

  20. SI Center - Services • Data QC and Operational Monitoring • Dredge Certifications • Dredge Operator Support • Corps User Support • Training • Database Maintenance • Specifications Maintenance

  21. Stakeholder Issues • T&E – Turtles & Sturgeon • Overdepth • Open Water Disposal Monitoring • Emergency Response Rentals • Regionalization • eGIS, eCoastal, RSM integration • Decision Support

  22. National Team R&D • Demo the Pipeline SI – 4 dredges FY07 • Field Review of Mechanical SI spec • Turtle Observer Form Entry • Bin Measurement issue • Provide hooks to GIS and other systems

  23. Implementation Issues • Funding Mechanism • Scope of Scow requirement; barges for upland disposal • Does always-on mean include the yard? – No • Certification and Recertification Issues • Mass vs. Volume production measure. TDS, Bin Measure

  24. Implementation Issues - 2 • Regulatory implementation • Enforcement standardization • Contractor data upload • Data Access

  25. http://si.usace.army.mil/ • Gary Howell – 251-441-5732 • James (Jay) Rosati – 251-441-5535 • Tim Welp – 601-634-2083 • Rhonda Lenoir – 251-690-3011