An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sustainable Growth through Network Optimization Team Name: ARBY’s BayuDaryanto RonaldoRotua Yuji Sakakibara Aurélia de Larrard

  2. Problem statement & Agenda (Aurélia de Larrard) • Problem statement • On the short term, how can Eaton reduce the premium freight frequency as well as the overall inventory level? • On the long term, how can Eaton ensure a sustainable growth? • Agenda • Problem statement • Recommendation • Existing SC network • Rationale • Strategy & Action Plan • Timetable

  3. Supply Chain Network (Aurélia de Larrard) Customer Manufacturing Solutions Center (CMSC) Plants Distribution Center Ware Houses

  4. Recommendation (Aurélia de Larrard) • We recommend building a major warehouse in Los Angeles • Building a major warehouse will allow: • Reduced use of air shipment on the west coast • Lower inventory in regional (west) CMSCs • Lower utilization rate of current warehouses W34-W87 • Reduce the fluctuation of the whole supply chain • Increase Service Level

  5. Pros and Cons of the other options (Aurélia) • Build a new CMSC (option 1) • Pros • Increase responsiveness • Reduce regional logistics costs • Cons • increase overall inventory • No reduction of air shipment • no improvement of warehouse capacity/high utilization rate • Extend plant storage of CMSC (option 3) • Pros • Lower investment cost • Improve local performance of close CMSCs • Cons • Limited capacity to reduce air shipment • Limited capacity to improve total inventory level

  6. Rationale to focus on the west(Yuji Sakakibara) West West

  7. Reducing Air shipment Cost (Yuji Sakakibara) • 2 modes of transportation • Truck: majority of the shipment • Air: emergency shipment • If EATON can achieve 100% Service Level, they do not have to use air shipment • Service Level (SL)=1 – (Air shipment / Total shipment)

  8. Analyzing Current Inventory(Yuji Sakakibara) COGS EX) Los Angeles-SAT Inventory Air: 16% of total shipment SS = Inventory + (COGS/10cycle/2) Z = NORMSINV(SL(%)) σ=SS/Z(Standard Deviation/Month) Standard DeviationofDemand in each city

  9. Pooling Inventory (BayuDaryanto) Current System Pooling System Std. dev. demand at W = √N * σ Std. dev. demand at 1 location =σ Safety stock at W = z * √N∗ σ Safety stock at each CMSC = z * σ Total safety stock at N RDCs = N z σ

  10. Cost Saving Benefits(BayuDaryanto) *) Targeted Service Level based on other regions

  11. Strategy & Action Plan(RonaldoRotua) • Short term • Build New Warehouse in Los Angeles • Set Up Pooling System • Long term • Pooling system in other regions • Evaluate the CMSC network based on future demand

  12. Timetable(RonaldoRotua)

  13. Issue with New Warehouse (Ronaldo Rotua) Mitigation

  14. Q&A(RonaldoRotua) Any Questions ?