To note / actions from Thursday. Size of missing glue areas that should be located in QA If no impact on cooling performance, can area propagate Path to defining QA need and techniques Tape dimensional accuracy/stability Manufacturer, during co-cure Path to understanding – Friday

lore
Download Presentation

Size of missing glue areas that should be located in QA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. To note /actions from Thursday • Size of missing glue areas that should be located in QA • If no impact on cooling performance, can area propagate • Path to defining QA need and techniques • Tape dimensional accuracy/stability • Manufacturer, during co-cure • Path to understanding– Friday • Use of dB • Path to location, definitions - Friday • Who will be point of contact for users • Tape token & cooling pipes first users • Co-curing – now baseline • Specification needed for local non-uniformity – path Friday • Mounting Brackets • Path to z=0 / z=1.3 fixation – Friday • Comparison of mounted staves stability, modes – restate friday • Z=0 fixation different, z=1.3 same (fixed) • Mass to be determined • Pull forces to be measured. Path to defining what matters – Friday • Cores • Corregated, honeycomb paper/CF – path to selection Friday • Corregated much weaker across – need specification – path Friday • Path to definition of gluing method - Friday Friday afternoon is a ‘planning’ session. Proposal was to compile list of items to discuss/ plan way forward

  2. Hysol versus CGL • CGL stave cores do not seem to result in ‘free’ pipes • CGL and hysol both acceptable • In absence of surprise - baseline is Hysol • Path to understanding CGL results– Friday • Hysol stave core pipe contraction to be measured • Shipping boxes • Path to decision on number, function, complexity – Friday • Intimately connected to production programme • Cooling pipes • Baseline is 125mm wall Ti -?? • Capillaries goal to have 125mm thickness walls • Orbital welding of these is under development • Non-standard pipe dimensions is painful – 1/8”? • Did we discuss • SE445 vs IRS2125 • Also for note • Laser welding ‘not progressing’