YE + 4 disks = 2 Nos. (12 Sectors each) Support Structures = 2Nos.

YE + 4 SHIELDING WALL FOR CMS. SCOPE OF WORK. YE + 4 disks = 2 Nos. (12 Sectors each) Support Structures = 2Nos. AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm ( 0,-0.5) Fasteners = 1 set (Trial Assembly). YE + 4 SHIELDING WALL FOR CMS. MATERIAL PURCHASE.

lorin
Download Presentation

YE + 4 disks = 2 Nos. (12 Sectors each) Support Structures = 2Nos.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. YE+4 SHIELDING WALL FOR CMS SCOPE OF WORK • YE+4 disks = 2 Nos. (12 Sectors each) • Support Structures = 2Nos. • AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5) • Fasteners = 1 set(Trial Assembly)

  2. YE+4 SHIELDING WALL FOR CMS MATERIAL PURCHASE • Material ordered = 10th Dec., 2010 • Material shipped = 21st March, 2011 • Material received = 29th April, 2011 to 6th May, 2011 • Beam HEB-220 and Channel UPN-400 = (Procurement in progress) • 1 set of fasteners = -do-

  3. YE+4 SHIELDING WALL FOR CMS MATERIAL LIST

  4. YE+4 SHIELDING WALL FOR CMS MATERIAL LIST (Contd.)

  5. YE+4 SHIELDING WALL FOR CMS MATERIAL TESTING AND ACCEPTANCE • Material testing = Completed • Certificates submitted to CERN = 25th May, 2011 • Mill Test Certificates and Cobalt Test reports • Material acceptance from CERN = 1st June, 2011

  6. YE+4 SHIELDING WALL FOR CMS ENGINEERING REPORT • Documents submitted to CERN = 12th April, 2011 • Final cutting plan • Final weld Identification/ details • Quality Plan • Production Technology • Q -PLAN approved by CMS=1stJune, 2011

  7. YE+4 SHIELDING WALL FOR CMS PRESENT STATUS • Marking and cutting of plates just started • Likely to be ready for pre assembly by Oct., 2011

  8. YE+4 SHIELDING WALL FOR CMS Q/A AND INSPECTION • Inspection points not selected by CMS • Authorized inspector by CMS yet to be nominated

  9. THANKS