1 / 28

Overview

Spectrum on a Budget E DUCAUSE October 9, 2006 Mitchell Lazarus | 703-812-0440 | lazarus@fhhlaw.com. Overview. Criteria for evaluating spectrum FCC licensing regimes Educational Broadband Service (formerly ITFS) LMDS, 24 GHz, 39 GHz Fixed service New unlicensed bands expanded 5 GHz

lorne
Download Presentation

Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spectrum on a BudgetEDUCAUSEOctober 9, 2006Mitchell Lazarus | 703-812-0440 | lazarus@fhhlaw.com

  2. Overview • Criteria for evaluating spectrum • FCC licensing regimes • Educational Broadband Service (formerly ITFS) • LMDS, 24 GHz, 39 GHz • Fixed service • New unlicensed bands • expanded 5 GHz • 24-24.25 GHz • 57-64 GHz • 92-95 GHz • TV white space • Hybrid licensing schemes.

  3. Introduction • Spectrum is the new real estate • essential for commerce and education • fixed supply – i.e., “they’re not making any more of it” • location (frequency) is everything • Well-established locations are crowded and expensive • bargains are still available in less developed areas.

  4. Criteria for Evaluating Spectrum • End-user compatibility • (consumer end use: Wi-Fi) • Frequency range • low: better propagation and building penetration • high: better directionality, smaller antennas • Degree of congestion (reduces reliability and throughput) • Cost of spectrum • auction / lease / “free” license / unlicensed • Cost (and availability) of equipment • worse for higher frequencies, newly authorized bands • FCC rules (power limits, service restrictions).

  5. FCC Licensing Regimes • Exclusive license • e.g., BRS/EBS, others • most are now auctioned; some can be leased • Frequency coordination • fixed microwave • spectrum is free; but entrant must protect incumbents • Unlicensed operation • Wi-Fi, Bluethooth, many others • spectrum is free; but some bands are congested • Hybrid schemes • mostly in newly authorized bands • promising for reliable, low-cost implementations.

  6. I. Exclusive License

  7. EBS/BRS -- Background • Formerly 31 video channels at 2500-2690 MHz • Educational Broadband Service (EBS) • formerly Instructional Television Fixed Service (ITFS), established in 1963 • used to distribute educational programming • Broadband Radio Service (BRS) • formerly Multichannel Multipoint Distribution Service (MMDS), established in 1983 • used for “wireless cable” entertainment services • MMDS often leased additional capacity from ITFS • and often paid for ITFS facilities.

  8. EBS/BRS – Evolution • “White space” around BRS licenses auctioned in 1995-96 • Sprint now holds a majority of BRS area licenses • (EBS white space still open) • Transition from video delivery to two-way broadband: • 1996: data delivery • 1998: two-way digital operation • 2001: mobile service • 2004: EBS and BRS frequencies repackaged • 2006: rules for transition to new frequency plan.

  9. Repackaged EBS • Three band segments: • upper and lower, each: 12 5.5 MHz, 1  6 MHz, 1  4 GHz • middle: 7  6 MHz (suitable for current video service) • ITFS now holding four 6 MHz channels will receive: • one 6 MHz in middle band • three 5.5 MHz in lower or upper band • one 1 MHz in a 4 MH band • ITFS now holding one 6 MHz channel will receive: • one 6 MHz in middle or one 5.5 MHz in lower or upper.

  10. Changing EBS Operation • Incumbents are protected against interference • Conversion to new frequencies will be fully funded • BRS licensees will negotiate transition • Leasing of EBS spectrum is allowed • licensees must reserve 5% for their own use • licensees have certain rights to recapture spectrum.

  11. EBS – Coming Developments • FCC plans to auction “white space” around EBS licenses • Only EBS eligibles may participate • but EBS bidders can accept funding from commercial interests, then lease out spectrum • Auction not yet scheduled • will be offered by geographic areas • may be separate channels or all channels together.

  12. LMDS, 24 GHz, 39 GHz • All underused bands: • Local Multipoint Distribution Service (LMDS) • 27.5- 29.25, 31-31.3 GHz (auctioned 1998) • 24 GHz (auctioned 2004) • 24.25-24.45, 25.05-25.25 GHz • 39 GHz (auctioned 2000) • 38.6 - 40.0 GHz • All have 10-year license terms • Renewal requires “substantial service” • licensees may be amenable to educational uses.

  13. II. Frequency Coordination

  14. Fixed Service • Suitable for long-distance, high-speed communication among fixed points • Equipment is readily available • Spectrum is free • but requires frequency coordination and license • not free -- $1-2.5K per link • newcomers must fit in among existing users • Bands (partial listing) • 10.55-10.68 GHz • 10.7-11.7 GHz • 17.7-19.7 GHz (with gaps) • 21.2-23.6 GHz.

  15. III. Unlicensed Operation

  16. Unlicensed Operation -- Principles • FCC sets technical rules (power, etc.) • intended to minimize interference to other users • Device is FCC certified as complying with technical rules • must be labeled with “FCC ID” number • Anyone may operate a certified device anywhere in U.S. • Interference rules: • an unlicensed device must accept all interference • an unlicensed device may not cause harmful interference to a licensed user.

  17. “Old” Unlicensed Bands • 902-928 MHz • shared with licensed users • extremely congested • 2400-2483.5 MHz • Wi-Fi “b” & “g” • shared with microwave ovens, cordless phones, etc. • moderately congested, getting worse fast • 5725-5850 MHz • Wi-Fi “a” • rapidly becoming congested • Maximum power in all bands: 4+ watts • most applications use only a few hundredths of a watt.

  18. “New” Unlicensed Bands • expanded 5 GHz • 24-24.25 GHz • 57-64 GHz • 92-95 GHz • TV white space (pending).

  19. Expanded 5 GHz • FCC added 255 MHz to 5 GHz band • tripled the band • “Dynamic frequency selection” (DFS) required to protect federal radars • devices must monitor for radars, change frequency • “Transmit power control” (TPC) required • automatically reduces output power to minimum needed • Should eventually take pressure off Wi-Fi b & g.

  20. 24-24.25 GHz • Lightly used • Maximum power for area coverage: 1/5o watt • comparable to most Wi-Fi • Point-to-point operation • maximum power: 1.9 watts • only in upper 80% of band • suitable for multiple T-1 speeds over hundreds of meters.

  21. 57-64 GHz • Lightly used band; mature technology • Provides extremely high data rates • can reach multiple gigabits/second • Tight antenna focus • hinders eavesdropping; improves security • Maximum power: 10 watts • Factors limiting range: • absorption by atmospheric oxygen • high rain fade.

  22. 92-95 GHz • Very clean spectrum • Very high data rates possible • Maximum power: 10 watts • But limited to indoor operation. • best regarded as experimental.

  23. TV White Space (Proposed) • FCC considering unlicensed use of vacant TV channels • proposes fixed and mobile applications • broadcasters oppose • IEEE (standards group) recommends fixed use only • e.g., for local broadband distribution • IEEE-proposed interference protection: • base station programmed for locally vacant channels • remote stations operate only under control of base • all remotes monitor for TV signals and report to base • FCC announcement expected October 12.

  24. IV. Hybrid Schemes

  25. 3650-3700 MHz • Every license allows nationwide use of the entire band • fixed and base stations are entered in an FCC database • new stations must protect incumbents • mobile stations require a control signal from a fixed or base station • Radios must use spectrum-sharing protocols • Licensees resolve interference issues among themselves • Band is under-used • commercial interests are wary of non-exclusive spectrum.

  26. 71-76, 81-86, 92-95 GHz • Every license allows nationwide use of any bandwidth • can be used only for point-to-point communication • Licensees register links in an automated database • new links must protect earlier-registered links • If harmful interference occurs, the later-registered link must resolve it • assumption: beams are narrow and will rarely interfere.

  27. Conclusion • Safe, established spectrum options are usually the most expensive • The FCC and manufacturers are working to open new bands • A willingness to innovate is the best route to reliable communications at low cost.

  28. Thank you! Mitchell Lazarus | 703-812-0440 | lazarus@fhhlaw.com

More Related