An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European XFEL Nick Walker (DESY) EU GDE MeetingOxford 25.10.2005

  2. EURO-XFEL

  3. 2005 2006 2007 2008 2010 2015… 2012… GDE process Baseline Config. Document (BCD) Ref. Design Report (RDR) + $€¥ TDR construction commissioning physics preparation construction operation EURO XFEL ILC Projected Time Line synergy EU FP7 ??

  4. 20 GeV SCRF linac • Primary focus: consolidate basic TTF technology • successful tech. transfer to industry • cost reduction through industrialisation • need extensive effort to achieve high reliability !!! • High-Gradient programme continues to be a priority for TESLA Tech. Collaboration • Both as part of the ILC and XFEL projects

  5. TESLA 9-Cell Cavity R&D • Leak check • Frequency Tuning • Damage Layer Removal • Furnace treatments • Final Frequency Tuning • Final Surface Preparation • Final Cleaning • Bake-out 120-130° C • Low-Power Acceptance Test • Tank Welding • Assembly for High-Power Operation • High-Power Testing Established after 10 years R&D Emphasis on QA/QC Reliable transfer to industry

  6. Electropolishing @ DESY Results from DESY & KEK Q0 Eacc MV/m New cavity production (30 cavities) will be put through EP Significant increase in statistics Specification / fine tuning of EP parameters (→ XFEL) → Module 6 (35 MV/m cryomodule) High gradient programmealso part of XFEL R&D

  7. Cavity R&D Fabrication from large grain or single-crystal Nb discs May remove the need for electropolishing ( cost!) JLAB (P. Kneisel) DESY DESY R&D within Europe funded by XFEL project

  8. SACLAY tuner (type III) Cavity Package Auxiliaries INFN blade tuner TTF TYPE-IIIHP Coupler industrialisation – cost – reliability

  9. Fabrication of TTF-3 Couplers 62 TTF-3 couplers have been fabricated to date 52 in industry

  10. (XFEL) Coupler Industrialisation Ongoing study at Orsay, France TTF-3 (baseline) XFEL coupler 4 diagnostics removed Motorized tuning

  11. (XFEL) Coupler Industrialisation Ongoing study at Orsay, France • Reduced part count • Design simplification • Tolerance studies • Assembly processes • Mounting sequences XFEL coupler

  12. LLRF

  13. Lorentz Force Detuning Compensation

  14. LLRF

  15. Cryomodule (CM) Variants Main European emphasis is on- industrialisation - reliability- cost optimisation TTF CM already 3rd generation

  16. Baseline ILC recommended baseline The FNAL Modulator • 3 modulators have been developed, built and delivered to TTF by FNAL since 1994 • They are continuosly in operation under different operation conditions • 7 modulators have now been constructed by European Industry FNAL Modulator at TTF

  17. Baseline ILC recommended baseline Baseline Klystrons Specification: 10MW MBK 1.5ms pulse 65% efficiency CPI Toshiba Thales

  18. Summary • XFEL preparation pushing SCRF R&D linac tech. R&D in Europe • Industrialisation • Cost reduction • Reliability • Much overlap with ILC • XFEL specs. and ILC baseline very similar • High-gradient programme remains part of XFEL programme