350 likes | 496 Views
Long-strip MRPC for CBM. Yongjie Sun Key Laboratory of Technologies of Particle Detection & Electronics, CAS University of Science and Technology of China. Index. R&D on MRPC (STAR TOF, STAR MTD, … ) Long-strip MRPC for CBM August test at GSI Summary and Outlook. Early R&D (2000-2002).
E N D
Long-strip MRPC for CBM Yongjie Sun Key Laboratory of Technologies of Particle Detection & Electronics, CAS University of Science and Technology of China
Index • R&D on MRPC (STAR TOF, STAR MTD, …) • Long-strip MRPC for CBM • August test at GSI • Summary and Outlook CBM-China meeting
Early R&D (2000-2002) beam test at PS-T10, CERN:efficiency >95%(5 gas gaps) >97%(6 gas gaps ) ~ 99%(double stack 2 5 gas gaps ) time resolution ~70ps( 5 gas gaps ) ~60ps( 6 gas gaps ) ~50ps(double stack 2 5 gas gaps ) MRPCs of different structures working gas mixture: F134A(90%)+iso- C4H10 (5%)+SF6(5%) M.Shao, L.J.Ruan, H.F.Chen et al., NIM A492(2002)344-350 60 CBM-China meeting
TPC- tracking VPD - start time measurement MRPC TOF (TOFr) – stop time measurement STAR Upgrade -PID Particle momentum; dE/dx ~8% resolution /K separation to ~0.6GeV/c k/p separation to ~1.0GeV/c Aim at 100ps time resolution TOF system /K separation to ~1.6GeV/c & k/p separation to ~3.0GeV/c CBM-China meeting
MRPC Structure for STAR/TOF Module size: 21.2×9.4×1.79 cm3 Gas gap:6×0.22mm In 200 GeV central Au+Au: Time resolution <100ps Efficiency 90% High granularity Rate >200Hz/cm2 MRPC strip size: 3.15cm×6.30cm CBM-China meeting
2007 2008 2006 1/2 3/4 5/6 7/8 11/12 1/2 3/4 5/6 7/8 1/2 3/4 5/6 7/8 11/12 9/10 9/10 Prod. Start 40 MRPCs +192 MRPCs +326 MRPCs +326 MRPCs +326 MRPCs MRPC Mass Production • After STAR Construction Readiness Review in April 2006, MRPC mass Production in China started. • University of Sci. & Tech. of China (USTC) will produce 1210 MRPCs CBM-China meeting
USTC site - MRPC Mass production 100 m2 clean room ( cleanness class 100K ): Temperature: 25o C Humidity: <40% 4 assembly desk ( cleanness class 100 ) CBM-China meeting
QC setup – cosmic ray telescope QC capability: 8 MRPCs / Day CBM-China meeting
Monthly output Totally, 1283 MRPCs have been produced. CBM-China meeting
Long time stability More stable at late production stage CBM-China meeting
TOF Time Resolution Summary 2003 to 2009 CBM-China meeting
STAR/MTD A large area of Muon Telescope Detector (MTD) at mid-rapidity,allows for the detection of di-muon pairsfrom QGP thermal radiation, quarkonia, light vector mesons, and Drell-Yan production single muonsfrom their semi-leptonic decays of heavy flavor hadrons advantages over electrons:no conversion, much less Dalitz decay contribution, less affected by radiative losses in the detector materials CBM-China meeting
(150kΩ/) 256mm Design and construction LMRPC -- side view 10 x 0.25 mm gas gaps in 2 stacks Glass thickness : 0.71 mm anode Short side cathode LMRPC PCB -- top view 950mm Long side Signal readout Size: 950 x 256 mm2 Read out strip: 25 mm wide, 4 mm gaps between strips Active area: 870 x 170 mm2 CBM-China meeting
Photos of construction CBM-China meeting
449” 252” 73” 72” 191” 164” 56 81 33 TOF2 MWPC1 MWPC2 LMRPC C1, C2 70” TOF1 TOF3 MWPC3 GEMs MWPC4 Upper stream Down stream FNAL Beam Test (T963) Beam test setup MWPC5 Beam Energy: 32 GeV CBM-China meeting
Results at T963 - I 60 Efficiency plateau Time resolution CBM-China meeting
Results at T963 - II • Using the tracking, we get the signal propagation velocity: ~ 60ps/cm • The half time difference of 2 ends of a strip: σΔT/2 ~ 1.1 channel (55ps) • Position resolution: ~ 1 cm Position resolution 3 prototypes working very well in STAR since 2007 CBM-China meeting
Long-Strip MRPC for CBM • Used in relative low track density environment to save electronics channels • Read out at two ends • Mean time Eliminate the position along the strip • Time difference Position information • Easy to construct for large area coverage • Three Prototypes was test in August at GSI The main focus: Cross-talk performance CBM-China meeting
MRPC structure (endview) Readout strips HV 5 x 250μm gaps 5 x 250μm gaps 2.5cm • Readout strips: 2.5 cm x 50 cm • HV electrode: Licron spray ~40 MΩ/□ • Made of window glass of 0.7 mm thick CBM-China meeting
MRPC #1 (topview) 2.5cm 24.1cm 0.6cm 55 cm • Gaps between strips: 0.6 cm CBM-China meeting
MRPC #2 (topview) The readout strips are “hollowed-out” alternately. Removed: 5 mm x 4 Left: 1 mm x 5 Removed: 2.5 mm x 9 Left: 0.25 mm x 10 Top/bottom pcb CBM-China meeting
MRPC #3 (topview) 2.5cm 0.7cm 24.1cm 0.8cm 55 cm • Gaps between strips: 0.7 cm (upper part) 0.8 cm (lower part) CBM-China meeting
<t2-(t3+t4)/2> <t1-(t3+t4)/2> ADC2 ADC1 ADC1 ADC2 Resolution~67 ps <t3-(t1+t2)/2> ((t3+t4)-(t1+t2))/4 ADC4 ADC3 ADC3 ADC4 PMT calibration <t4-(t1+t2)/2> CBM-China meeting
T-(t1+t2+t3+t4)/4 T-(t1+t2+t3+t4)/4 ADC <T-(t1+t2+t3+t4)/4> T-(t1+t2+t3+t4)/4 ADC MRPC Calibration Intrinsic timing resolution = 67 ps (including momentum spread) CBM-China meeting
Efficiency and resolution plateau 97% 65 ps CBM-China meeting
Position scan (±7 kV) Trigger Area: 2 cm wide No significant efficiency drop in the gap From both “charge sharing” and cross talk. CBM-China meeting
Cross Talk Trigger Area: 2 cm wide Trigger on the strip center: “Cross talk” at neighbor strips: 3% “Cross talk” at next-to-neighbor strips: ~2% Require valid TDC on two ends CBM-China meeting
TDC vs. QDC Valid TDCs and valid QDCs (3 sigma above pedestal) Valid TDCs CBM-China meeting
Valid TDCs and QDCs MRPC #2 CBM-China meeting
Efficiency vs. Position Valid TDCs CBM-China meeting
Valid TDCs and valid QDCs (3 sigma above pedestal) CBM-China meeting
MRPC #3 CBM-China meeting
Efficiency vs. Position Valid TDCs CBM-China meeting
Summary • USTC has experience on MRPC technology. • Capability of mass production • Manpower on online QA, calibration, related physics analysis • CBM RPC-TOF? Thank you! CBM-China meeting