160 likes | 258 Views
Supporting Project Management with AMF. Jeremy Fienhold Don Kranz. Introductions. Don Kranz Lead Architect for AMF & AWB Jeremy Fienhold Lead Analyst on a project using AWB. Analysis & Management Framework.
E N D
Supporting Project Management with AMF Jeremy Fienhold Don Kranz
Introductions • Don Kranz • Lead Architect for AMF & AWB • Jeremy Fienhold • Lead Analyst on a project using AWB
Analysis & Management Framework • Provides a high level assurance based ontology that allows information to be shared between IV&V tools. • Too much decomposition reduces flexibility, modularity and portability of design. • At the simplest level we deal with: • Projects • Participants • Artifacts • Assessments • Actions
IVV 09-1 Manage Responsibilities • “A continual review of the IV&V effort • Revision of the IPEP as necessary based upon updated Mission Project schedules and development status • Coordination of the IV&V results with the developer and other appropriate management groups • Promotion of technical exchange between IV&V and the developer (to improve technical knowledge transfer and increase IV&V effectiveness) • Identification of process improvement opportunities in the conduct of IV&V”
Scoping Behaviors Modules Scoping
Change Impact Modified Artifact(s) Previous Assessment(s)
Future Functionality • Improve ORBIT integration • Add reporting capabilities • Add Admin UI for project configuration • Improve support of EBA & TR • Integration with COMPASS
References • IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012 • IVV 09-4 Version AF: Project Management, May 2, 2013 • T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013 • S3106 Version D: PBRA and RBA Process, October 4, 2012 • AWB User’s Guide • AMF Architecture & Design document