COMITATO NAZIONALE ITALIANO

COMITATO NAZIONALE ITALIANO. 43 rd CIGRE General Session Paris, 23-27 August 2010 Study Committee C1 System Development & Economics Report on CIGRE General Session and Study Committee Meeting. 1. 1. Summary Summary of the SC General Session in Paris

louis-gill
Download Presentation

COMITATO NAZIONALE ITALIANO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMITATO NAZIONALE ITALIANO 43rd CIGRE General Session Paris, 23-27 August 2010 Study Committee C1 System Development & Economics Report on CIGRE General Session and Study Committee Meeting 1 1

  2. Summary • Summary of the SC General Session in Paris • Preferential subjects for 2012 CIGRE Session • Overview of ongoing WG and new WG discussed at the SC C1 meeting

  3. Summary of the SC General Session in Paris (1/3) Overarching theme: relationships between the progressive decarbonisation of the power sector and the system planning Binding targets for GHG emission reduction are being enforced not only in Europe, but in other areas of the world, including the US (see, f.i., RGGI – the Northeast’s Regional Greenhouse Gas Initiative-) • rapid transformation of the generation endowment • increase of energy efficiency along all the power sector chain, from generation to the end uses through the grid Consequently the grid must evolve towards a greater flexibility to avoid that an insufficient transmission capacity sets a barrier towards a higher penetration of RES generation.

  4. Summary of the SC General Session in Paris (2/3) • Three preferential subjects: • "Solutions for planning power systems for a low carbon energy future" (Sp.Rep.: B. Cova) • ”New business process to support/facilitate power system design for a low carbon energy future” (Sp.Rep.: J.F. Alonso) • ”Asset management challenges/strategies (replace-ment, refurbishment and maintenance) for a low carbon energy future" (Sp.Rep. Ch. Druet)

  5. Summary of the SC General Session in Paris (3/3) Main Outcomes • The power system development is often dealt with in the wider context of energy transport (multi-energy approach), though “credible” solutions are still to come; • Decisional criteria for investments are more and more often based on factors having different metrics (e.g.: investment cost vs. environmental impact, population consensus, etc.) => need to resort to “multi-criteria” methodologies => “multi-criteria planning” • Changing in planning procesures adding new components, such as impact on “power market” efficiency and GHG emissions when proposing a new investment, • Higher importance of the assessment of the power system performances in the planninbg stage, to account in due advance the systeme behaviour facing a high penetration of non dispatchable RES generation

  6. Preferential subjects for 2012 CIGRE Session (1/2) Unifying theme: “Planning, investment and asset management for the power system of the future” – Draft agreed at the SC C1 meeting • System Planning (Sp.R.: M. Alzira Silvera) • What are the planning options to deliver power system flexibility and maintain reliability and quality of supply as the role of the power system changes: • Future generation sources and system services / Uncertainty of supply and demand / Changing transmission/distribution interface / Changing role of the customer • Asset Management (Sp. R.: E. Rijks) • How is asset management evolving in order to meet future power system challenges where increased flexibility is required to address greater uncertainty? • Dispersed generation / Asset condition/utilisation / New measures for risk management in the transmission grid

  7. Preferential subjects for 2012 CIGRE Session (2/2) Unifying theme: “Planning, investment and asset management for the power system of the future” – Draft agreed at the SC C1 meeting Business Planning (Sp. R.: M. Zwicky) What approaches, methods and tools are being developed to address the investment challenges in delivering future power systems: oStakeholder engagement (public perception and planning permits) oEnvironmental/Sustainability considerations oBusiness case development and financing of projects oRisk of stranded assets/ Risk of late delivery of capacity oPlanning issues and investment coordination with electric and other utilities

  8. Overview of ongoing WG

  9. New proposed WG

  10. C1 Strategy and Action Plan for more reading:….. SC C1 – Strategy and Action Plan 2010-2018