First Floor Plan

First Floor Plan. Description – First Floor: Library - Two story plus mezzanine Main library on the second floor Office/support spaces on the first fl. Proposed project includes: -Addition of classrooms, computer lab, training rooms, tutoring areas, faculty offices and support spaces.

Download Presentation

First Floor Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First Floor Plan • Description – First Floor: • Library - Two story plus mezzanine • Main library on the second floor • Office/support spaces on the first fl. • Proposed project includes: • -Addition of classrooms, computer lab, training rooms, tutoring areas, faculty offices and support spaces. • Original Plan – Two Phase Approach: • Phase 1: • Minor improvements, paint, carpet, finishes and furniture • Scheduled completion: September 2013 • Phase 2: • Alter floor plan to include a classroom, computer lab, training room, and student support spaces. • DSA approval required • Scheduled completion: February 2014

  2. Second Floor Plan • Description – Second Floor: • Main library space • Offices/support spaces • Connection to adjacent buildings via raised walkway • Proposed Second Floor Improvments – Original Plan: • Phase 1 • New paint, carpet, finishes to support spaces • Phase 2 • New classroom • Reconfigure library circulation desk

  3. Project Schedule Project Schedule: Design Development: May 27 – June 30, 2013 Construction Documents: July 1 – August 23 DSA Plan Check (4 month estimate): August 26 – December 20 Bidding: January 2014 Construction (6 months): February – July Move-In: August 2014