1 / 16

NEESgrid Early Adopter Program

NEESgrid Early Adopter Program. Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team. Agenda. Introduction: 11:15 to 11:30 AM (Sridhar Gullapalli) Outline and goals: People on each team POC E-Mail Lists EA Plan: 11:30 to 11:45 AM (Sridhar Gullapalli)

louisa
Download Presentation

NEESgrid Early Adopter Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEESgrid Early Adopter Program Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team

  2. Agenda • Introduction: 11:15 to 11:30 AM (Sridhar Gullapalli) • Outline and goals: • People on each team • POC • E-Mail Lists • EA Plan: 11:30 to 11:45 AM (Sridhar Gullapalli) • EA Plan Discussion: 11:45 AM to 12:15 PM (Laura Pearlman) • Next Steps: 12:15 PM to 12:45 PM (Doru Marcusiu) • Site Responsibilities • SI Team Responsibilities

  3. The EA Plan (11:30 AM to 11:45 AM) SG

  4. Architecture Approach (System Architecture Document) • Develop common infrastructure that can used across all NEES applications • Balance generic mechanisms, extensibility for future growth, efficiency for application specific tasks • Validate against user requirements • Input from user requirements analysis, site visits • Extending proven grid technologies • Developing custom solutions for NEES specific requirements (e.g. Data, DAQ, Video services)

  5. The Early Adopter Program(from the EA Document) • Spiral Model • Iterative deployment, testing and refinement • Timeline roughly 6 months (this phase) • EA sites • RPI, Reno, Oregon State • Shadow Sites and other users • NEES Equipment Sites • Researchers in Earthquake Engineering field

  6. The Generic EA Experiment: The Preparation Phase

  7. Generic Experiment in Progress (an instance or “test”)

  8. Conclusion of a “test” or “run” Change/adjust parameters and repeat test or conclude experiment or revise experiment

  9. Partial listing of components • Collaboration Tools • Local (on-site) Storage & Central Data Repository • DAQ • Prototype Data Models and Services • Streaming data services • Streaming video Services • Tele-operations (control will not be supported during the EA Phase) • NEESPOP and Services

  10. Global Timelines • Communicating Plan Apr 15 • Tracking NMI release May 7 • Strawman data model Apr 15 • LabVIEW setup at ANL/ISI May 15 • NEESPOP, Video Server and Local Storage Solution, LabVIEW DAQ (version 6.1) setup and installation at EA Jun 1 • Prototype Telepresence server at EA Jul 1 • Streaming data specification Aug 1 • Streaming data implementation (based on LabVIEW version 6.1) Aug 1 • Initiate Experiments phase 1 Jul 15 • Conclude Experiment Phases Oct 15

  11. EA Plan Discussion: 11:45 AM to 12:15 PM (LP) • Is the generic experimental model accurate? Representative? • Are site specific modes accurate? • Tune up details

  12. Next Steps: 12:15 PM to 12:45 PM (DM) • Site Responsibilities (DM) • Status of Equipment and Software purchase • NEESPOP • Video Server (Linux box) + cameras + appliances • Local Storage Solutions • DAQ: Setup and LabVIEW 6.1 installation • Hardware Installation • Access to systems by SI team • Define Experimental Requirements • Define Experimental Procedures • Learn/Use Collaboration Tools

  13. SI Team Responsibilities • Installation and Configuration (12:30 to 12:45 PM) • NEESpop • Grid Services software • Data management tools • Support Software • Video Server (hardware and software) (NZ) • Local Storage Solutions (JF) • Data Acquisition Services (PH) • Collaboration Tools (EH, JL) • Support Issues (DM)

  14. The SI Team: • USC/ISI • Carl Kesselman carl@isi.edu SI Co-PI • Sridhar Gullapalli sridhar@isi.edu ISI Project Manager • Laura Pearlman laura@isi.edu Lead System Architecture • Argonne National Labs • Ian Foster foster@mcs.anl.gov SI Co-PI • Nestor Zaluzec zaluzec@aaem.amc.anl.gov Lead (Tele-Operations/DAQ) • Paul Hubbard hubbard@mcs.anl.gov Lead System Architecture (Tele-Ops, DAQ) • Bill Allcock allcock@mcs.anl.gov ANL Project Manager • U Michigan • Tom Finholt finholt@umich.edu CO-PI User Requirements and Collaboration Tools • Elizabeth Wierba <wierba@umich.edu>, User Requirements • Jeremy Birnholt  jbirnhol@umich.edu User Requirements • Joseph Hardin <hardin@umich.edu> Collaboration Tools • Lars Schumann larsi@umich.edu Collaboration Tools • Erik Hofer ehofer@umich.edu Collaboration Tools • John Leasia jleasia@umich.edu Collaboration Tools • Peter Knoop knoop@umich.edu Collaboration Tools • Glenn Golden ggolden@umich.edu Collaboration Tools

  15. The SI team (continued) • NCSA • Tom Purdhomme tip@ncsa.uiuc.edu PI • Kyran D. Mish kdmish@llnl.gov, Deputy Director, NEESgrid • Cristina Beldica cbeldica@ncsa.uiuc.edu Project Manager • Randy Butler rbutler@ncsa.uiuc.edu Deployment Lead • Joe Futrelle futrelle@ncsa.uiuc.edu Data Model and Services • Doru Marcusiu marcusiu@ncsa.uiuc.edu Deployment • Chase Phillips cphillips@ncsa.uiuc.edu Deployment • Kazi Anwar kazi@ncsa.uiuc.edu Deployment • John Towns jtowns@ncsa.uiuc.edu Deployment • M Butler mbutler@ncsa.uiuc.edu, Deployment • Jason Alt jalt@ncsa.uiuc.edu Deployment • David Gehrig dgehrig@ncsa.uiuc.edu Technical Writer • Jeff Gaynor jgaynor@ncsa.uiuc.edu Deployment

  16. The EA Teams • Oregon State • Solomon Yim solomon.yim@orst.edu Professor & PI of Tsunami Basin Project, • Ken Ferschweiler kennino@nacse.org Software • Charles Sollitt, Charles.Sollitt@orst.eduDirector of Wave Research Laboratory, • Terence Dibble, Terence.Dibble@orst.eduWave Research Laboratory • David Standley, David.Standley@orst.edu Software • Reno • Ian G. Buckle, igbuckle@unr.edu PI • Manos E. Maragakis, maragaki@ce.unr.edu Co-PI data/video sharing and live video • Sherif Elfass, elfass@unr.edu Manages research and information services • Gokhan Pekcan, pekcan@unr.edu Laboratory Research Engineer and NEES Project Manager (POC) • RPI • Tarek Abdoun abdout@rpi.edu Co-PI of RPI's NEES project, Manager of the RPI centrifuge and NEES project • Ricardo Dobry, PI • Christophe Dupre duprec@scorec.rpi.edu NEES Network Consultant • Mourad Zeghal, zeghal@rpi.edu Co-PI and Point of Contact • Tom Zimmie

More Related