1 / 21

Early Adopter Partner Challenge

Early Adopter Partner Challenge. SmartSignal SISCO. SmartSignal/OSIsoft SmartConnector:. Increasing the value of your PI System. Steve Tonissen Richard Marcell. PI. PI. EPI* Center. PI. PI. PI. EPI* Center. Leverage your existing PI Infrastructure.

lilly
Download Presentation

Early Adopter Partner Challenge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Early Adopter Partner Challenge SmartSignal SISCO

  2. SmartSignal/OSIsoft SmartConnector: Increasing the value of your PI System Steve TonissenRichard Marcell

  3. PI

  4. PI

  5. EPI* Center PI

  6. PI PI EPI* Center Leverage your existing PI Infrastructure • Increased equipment availability. • Decreased unplanned maintenance and costs. • Minimal learning curve. • Process Book visualizations already familiar. • Information from SmartSignal automatically replicated into PI environment.

  7. Chemical and PetroleumStandardized Models Herbert Falk SISCO

  8. What is the Model RSM Team • MIMOSA- Alan Johnson, Ken Beaver • OAGi – Dave Connelly • WBF – Dave Emerson • ISA 88 – Dennis Brandl • ISA 95 – Keith Unger • OLF – Tore Langeland, Magne Valen-Sendstad • OSIsoft – Jack Aude, Chris Coen • DNV - Henrik Smith-Meyer • Energistics – Jerry Hubbard • DOW – Rus Dickinson • Chervron – Mike Brooks, Kevyn Renner • SISCO – Herb Falk, Lorenzo Childress • IBM – Jon Siudut, Karthik Seetharaman, Jerry Kopecky, Ron Montgomery RSM Team Objectives/Milestones • Objectives • Advance the modeling work • Insure compliance with the participating standards • Milestones • Identify the appropriate standards community to own the RSM • Initial release of the RSM in the October timeframe

  9. ISA-88 Topology View (Visualization) S01 CV03 F1 F1 CV01 P01 CV02 Connectivity Mv( flow ) S01 ISA-88 Equipment View CV03 Add Material CV01 CV01 P01 CV02 CV02 CV03 Mv( state ) Mv( pumpspeed ) S01 ISA-88 Measurement View Supports various business views Process View F1 S01 CV03 CV01 CV02 P01 T01 Also context to ISA95 transactions with SAP.

  10. Implementing allows: Building Physical Connectivity Association Measurements to Equipment Perform Transmitter Surveillance(Condition Based Monitoring/Maintenance) KPI(s)

  11. Allows: Alarms and Notificationsa powerful combination

  12. Transmitter Surveillance Architecture Other Applications CBMApplication WS Standards Based Model Driven SOA Architecture PI-AF RTWebParts Other 3rd PartyRepositories

  13. The Objective: Process and Location Transparency Corporate

  14. Questions?

More Related