1 / 11

NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zolt á n NAGY-BEGE

NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zolt á n NAGY-BEGE ROMANIAN ENERGY REGULATORY DEPARTMENT Member of the Regulatory Board. ANRE. ANRE. ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid.

louise
Download Presentation

NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zolt á n NAGY-BEGE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEWS ON THE E-RES SUPPORT SCHEME IN ROMANIA Zoltán NAGY-BEGE ROMANIAN ENERGY REGULATORY DEPARTMENT Member of the Regulatory Board ANRE Bucharest - 19 November 2013

  2. ANRE • ANRE Order no. 30/2013 – The technical conditions for the PV power plants for connection to the grid. • Capacity limit for dispatchable PV power plants – 5 MW Bucharest - 19 November 2013

  3. ANRE • 2012 Monitoring report on GC support scheme – March 2013 • ANRE proposed the reduction of GC number starting from 1st January 2014: • 1,5 CV for wind (instead of 2CV) • 2,3 CV for hydro (instead of 3CV) • 3 CV for PV (instead of 6CV) Bucharest - 19 November 2013

  4. ANRE • EGO no. 57/2013 for amending Law no. 220/2008 • PV power plants on agricultural lands • Electricity which exceeds the hourly notifications will not get GCs • Postponement of GCs (1 GC for Wind and Hydro, 2 GC for PV) • GC trading is not permitted for electricity traders who acts only on the wholesale market Bucharest - 19 November 2013

  5. ANRE • EGO no. 57/2013 for amending Law no. 220/2008 • GC trading allowed only on centralized markets • Overcompensation monitoring twice a year • Annual capacity limits (PNEAR) • Possibility to include renewable energy in the regulated contracts Bucharest - 19 November 2013

  6. ANRE • ANRE adapted the secondary legislation to EGO 57/2013 • Order no. 55/2013 – amending Order 42/2011, Accreditation regulation • Order no. 56/2013 – amending Order 43/2011, GC issuing regulation • Order 57/2013 – Regulation of the organization and functioning of the GC market (revokes Order no. 44/2011) Bucharest - 19 November 2013

  7. ANRE • ANRE Order no. 48/2013 – The new regulation for licensing and authorising (replaces GD no. 540/2004) • ANRE Order no. 59/2013 – The new regulation for connection to the grid (will replace GD no. 90/2008) Bucharest - 19 November 2013

  8. ANRE *=estimation Bucharest - 19 November 2013

  9. ANRE Bucharest - 19 November 2013

  10. ANRE • Feed-in tariffs …? Bucharest - 19 November 2013

  11. ANRE THANK YOU! zoltan.nagy@anre.ro Tel: 0730 089 404 Bucharest - 19 November 2013

More Related