1 / 17

GE Cell Phone Tower

Team Seven: Fanny Wu Sam deVries Bharadwaj Mathukumilli Chris Cioffi Sponsored by GE. GE Cell Phone Tower. Problem Statement. Third world nations often lack a reliable grid where the majority of the population is living under the poverty line.

lovey
Download Presentation

GE Cell Phone Tower

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Seven: Fanny Wu Sam deVries BharadwajMathukumilli Chris Cioffi Sponsored by GE GE Cell Phone Tower

  2. Problem Statement • Third world nations often lack a reliable grid where the majority of the population is living under the poverty line. • Hence, we need to find a design that will create a self-sustaining operating system for a cell phone tower to be placed in a location with unreliable access to the mobile network.

  3. Our Mission: • Our mission is to design a sustainable energy system for a region without access to the grid which will provide reliable power to a cell phone tower that operates with minimal costs and maximum profit.

  4. Southeast Kenya • Economy: • Finance • Investment • Tourism • Agriculture flat landscape • Politics: • Very politically stable compared to other African nations • Mombasa’s Landscape • Flat • Very little rain • Rarely Windy • Sunlight • Customers • Potential network of 326,080 mobile subscribers • Phone Service Providers: • Zain and Safaricom

  5. Wind Power • Propeller generates power from wind • Effective over time, but not consistent from day to day due to fluctuating wind speeds in Kenya.

  6. Hydroelectric Power • Propeller is placed underwater in a river to generate electricity reliably and consistently. • Disadvantage: not many rivers in Tanzania, so not very practical.

  7. Diesel Power • A reliable source of energy, but uses fuel to run it which is not a renewable resource.

  8. Solar Power • Solar panels generate enough power to run the station and store extra energy into a battery for use at night or on overcast days.

  9. Design Matrix

  10. Selection Matrix

  11. Our Selection: • Power the tower primarily with solar energy. • Store extra solar power in battery. • Use a diesel generator as a back-up.

  12. Our Design:

  13. Hut Design

  14. Cost Analysis

  15. Cash Flow Diagram

  16. System Features • Main Hut: • Cinder block walls • Wooden framed roof • Six 5’ by 4’ solar panels on roof • GE’s Durathon battery • Base Transmitter system • Air conditioning • Lighting system • Cell Phone Tower: • Guyed tower

  17. Team Seven would like to thank GE for sponsoring this cell phone tower design project.

More Related