460 likes | 475 Views
Chinese Taipei APEC Engineer. Oral Interview. Reporter: XXX CHANG ( 張三 ). Chinese Taipei APEC Engineer. Personal Information. Chinese Taipei APEC Engineer. Personal Information Name : XXX CHANG ( 張三 ) Date of Birth : xx January 19XX Affiliation : ABC Company
E N D
Chinese Taipei APEC Engineer Oral Interview Reporter: XXX CHANG (張三)
Chinese Taipei APEC Engineer Personal Information
Chinese Taipei APEC Engineer • Personal Information • Name : XXX CHANG (張三) • Date of Birth : xx January 19XX • Affiliation : ABC Company ( 恭喜發財工程股份有限公司 ) • Position :Electrical Engineer of Engineering Dept.
Education Background Bachelor Degree : National XXX University, Department of Electrical Eng. , 19XX Chinese Taipei APEC Engineer
Chinese Taipei APEC Engineer • Professional Engineer Qualification • Qualification Examination Passed : • Discipline :Electrical Engineering • Issued by : Examination Yuan • Year : 19XX • Certificate No. : (XX) 專高字第xxx號
Chinese Taipei APEC Engineer • Professional Engineer Qualification • Professional Engineer Certificate : • Discipline : Electrical Engineering • Issued by : Public Construction Commission • Year : 20XX • Certificate No. : 技執字第xxxxxx號
Chinese Taipei APEC Engineer General Engineering Experience Report
Chinese Taipei APEC Engineer • General Engineering Experience Report (1) • Project Name : XXX Company – XXX Project . • Location: XXX County • Nature of work: Basic design, Review contractor’s drawings • Position/Title: Engineer of XXX Project • Duration : from Jun., 19xx to Oct., 19xx
Chinese Taipei APEC Engineer • General Engineering Experience Report (2) • Project Name : XXX Company-XXX Project • Location : XXX County • Nature of work: Plan, Basic design, Cost evaluation , Review contractor’s drawings • Position/Title: Engineer of Engineering Dept. • Duration : from Oct, 19XX ~ Jan., 20XX
Chinese Taipei APEC Engineer • General Engineering Experience Report (3) • Location: XXX County • Nature of work: Plan, Basic design, Cost evaluation , Review contractor’s drawings • Position/Title: Engineer of Engineering Dept. • Duration : fromJuly, 19xx ~ Feb., 20xx • Project Name : XXX Company-XXX Project
Chinese Taipei APEC Engineer • General Engineering Experience Report (4) • Location: XXX County • Nature of work: Plan, Basic design, Cost evaluation , Review contractor’s drawings • Position/Title: Engineer of Engineering Dept. • Duration : Oct., 20xx to Present • Project Name : XXX Company - XXX Project
Chinese Taipei APEC Engineer • General Engineering Experience Report (5) • Project Name : XXX Company - XXX Project • Location: XXX County • Nature of work: Plan, Basic design, • Cost evaluation , • Review contractor’s • drawings • Position/Title: Engineer of Engineering Dept. • Duration : Mar., 20XX to Present
Chinese Taipei APEC Engineer • General Engineering Experience Report (6) • Project Name : XXX Project • Location: XXX County • Nature of work: Plan, Basic design, • Cost evaluation , • Review contractor’s • drawings • Position/Title: Engineer of Engineering Dept. • Duration : Sep., 20XX ~ Jun., 20XX
Chinese Taipei APEC Engineer • General Engineering Experience Report (7) • Project Name : XXX Company - XXX Project • Location: XXX County • Nature of work: Plan, Basic design, • Cost evaluation , • Review contractor’s • drawings • Position/Title: Engineer of Engineering Dept. • Duration : Mar., 20XX to Present
Chinese Taipei APEC Engineer • General Engineering Experience Report (8) • Project Name : XXX Company – XXX Project • Location: XXX County • Nature of work: Feasibility Study • Position/Title: Engineer of • Engineering Dept. • Duration : Jun., 20xx ~ Oct., 20xx
Chinese Taipei APEC Engineer Two (2) Years of Significant Experience
Chinese Taipei APEC Engineer • Two Years of Significant Experience • Project name :XXX Company - XXX Project • Personal contribution and responsibilities: In charge of planning, basic design and cost evaluation of electrical facilities of 40MW×2 hydropower plant and control system of hydromechanics.
Chinese Taipei APEC Engineer • Two Years of Significant Experience • Problems Faced : The owner requested two(2) main transformers in the underground power plant must be moved to the outdoor switchyard for the safety consideration. However, there were no sufficient space to equip them. • Solution found: After the preliminary discussion with civil engineer, there was enough space right above the top of the mountain of underground power plant to accommodate the whole outdoor switchyard including the 2 main transformers.
Chinese Taipei APEC Engineer • Two Years of Significant Experience • Judgments made : Carried out the following evaluations: 1. The equipment layout space 2. Transmission line loss between the underground power plant and the over ground switchyard 3. Power connection between the switchyard and the transmission line 4. The equipment haulage and their maintenance space 5. The transportation of the maintenance personnel 6. The cost of the equipment and civil work etc. It was confirmed that the outdoor switchyard including 2 main transformers might all be moved to the top of the mountain located around 170m.high above the underground power plant..
EL.326 Power House Chinese Taipei APEC Engineer • Two Years of Significant Experience EL.334 Adit EL.495 Switchyard
Chinese Taipei APEC Engineer • Two Years of Significant Experience • Impact generated : Under the proper attention to both safety and the economical consideration, the Client obtained a modernized hydro power station.
Chinese Taipei APEC Engineer Three (3) Elective Experiences Claimed
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (1) • Project name :XXX Company - XXX Project • Personal contribution and responsibilities: In charge of planning, basic design and cost evaluation of electrical facilities and control system of hydro mechanical equipment.
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (1) • Problems faced: The path to the XX dam was interrupted frequently because of weather influence ( slope sliding), and it caused the unstable electricity supply and the difficulty of the operation of hydro mechanical equipment in the dam area if the power cable and optical fiber were installed by overhead line method. • Solution found: To install the power cable and optical fiber by using the XX creek diversion tunnel in order to meet the operation requirements
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (1) • Judgments made : Considering the benefits and cost of different type of the installation method for power cable and optical fiber : 1. By embedded conduits along the path to the dam. 2. By cable tray going through the XX creek diversion tunnel to the dam. After confirmation with hydraulic engineer, reserving enough installation space on the top of without water portion of the XX creek diversion tunnel in the length of about 2.2km would be reserved.
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (1) XX creek diversion tunnel XX dam XXX Lake
Three Elective Experience Claimed (1) Impact generated : Experienced typhoons strike and the avalanche of the pathway, after the project was completed, the electrical supply and remote control of all the hydro mechanical equipment won’t be interrupted. Chinese Taipei APEC Engineer
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (2) • Project Name : XXX Company – XXX Project • Personal contribution and responsibilities: In charge of planning, basic design and cost evaluation of electrical facilities of hydropower plant and switchyard.
1500 標高(公尺) El.1407.5 El.1407.5 El.1245 El.950 1000 XX分廠 El.747.8 XX分廠(待復建) El.555.0 500 El.439.0 XX分廠 XX分廠 XX機組 0 60 50 30 40 90 10 20 70 80 (公里) Chinese Taipei APEC Engineer • Three Elective Experience Claimed (2) • XX分廠:234MW • XX分廠:360MW • XX分廠:212.8MW • XX分廠:195MW • XX分廠:133.5MW
Three Elective Experience Claimed (2) Problems faced: The original switchyard located at the area adjacent to the XX river was threatened by flood. Solution found : Suggests to remove the switchyard to the XXX Center, which locates much higher than the original location. judgments made: 1. In cooperating with hydraulic engineer to carry out the evaluation of the flood probability. 2. Estimating the power cable line loss between the underground power plant and the over ground switchyard. Chinese Taipei APEC Engineer
廠房通道分支隧道 New S.Y. 新建廠房通道 Chinese Taipei APEC Engineer • Three Elective Experience Claimed (2) Existed S.Y. 地下廠房
Three Elective Experience Claimed (2) judgments made: 3. Estimating the best connection way to the existed transmission line 4. Estimated the best connection way to the existed transmission line. 5. Estimated the equipment haulage, the maintenance space, the transportation of the maintenance personnel. 6. Evaluated the cost of the equipment and civil work etc. It is finally agreed by the Client that the switchyard shall be moved to the proposed place. Chinese Taipei APEC Engineer
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (2) Existed S.Y (20xx) Existed S.Y (20xx) New S.Y (20xx)
Three Elective Experience Claimed (2) Impact generated : 1.To ensure that the power output of the rehabilitation of hydro power plant will never be influenced by the flood. 2.It has already passed the tests of typhoons and heavy rain from last year to present. Chinese Taipei APEC Engineer
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (3) • Project name :XXX Project • Personal contribution and responsibilities: In charge of planning, basic design and cost evaluation of electrical facilities and control system of hydromechanics, etc. • Problems faced: In traditional designation, the cooling media of the air cooler for generator must be relied on clean water. The owner concerned about the muddy water of XX river would cause the cooling problem of the generator unit.
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (3)
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (3) • Solution found: Adopted the circulation type cooling method in order not to use the muddy water directly. • judgment made By discussing with the manufacturer of the generator, it has finally accepted to install the water to water heat exchanger in the tailrace tunnel, and the after cooling water was circulated back to the air cooler in the power house by the circulating pumps.
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (3)
Chinese Taipei APEC Engineer • Three Elective Experience Claimed (3) • Impact generated: 1. Though the circulation type cooling method caused the increase of station service power, the quality of the cooling water is satisfied. 2. It has been working smoothly since Dec. 20xx.
Chinese Taipei APEC Engineer Summary of CPD Activities Claimed
Chinese Taipei APEC Engineer • Summary of CPD Activities Claimed for Year 19X6~19X8
Chinese Taipei APEC Engineer • Summary of CPD Activities Claimed for Year 19X6~19X8 • Total CPD Credit-Hours
Chinese Taipei APEC Engineer Code of Ethics forChinese Taipei APEC Engineer.
Chinese Taipei APEC Engineer • Codes of Ethics for Chinese Taipei APEC Engineer 1. Responsibilities to the Society 1.1 Dedicate and Adhere to the Law 1.2 Respect Nature 2. Responsibilities to the Profession 2.1 Commit to Professionalism and Duty 2.2 Be Creative and Enterprise 3. Responsibilities to the Client 3.1 Render Services with Sincerity 3.2 Faithfully Seek Mutual Benefits 4. Responsibilities to the Colleagues 4.1 Cooperate with Specialists in Other Fields 4.2 Ensure the Continuity of the Professional Contributions
Codes of Ethics for Chinese Taipei APEC Engineer I declare to obey and be bound by the above codes. Singed : XXX CHANG Date : day-month- 20XX Chinese Taipei APEC Engineer
Chinese Taipei APEC Engineer Thank you for your patience