VSOP-2 project Update

VSOP-2 project Update. Tracking Station mtg,, Feb. 19 & 20, 2006, OAM Madrid. H isas hi Hirabayashi /JAXA VSOP-2 Project status Spacecraft and instruments. Act 2. VSOP-2 Project Budget request was approved Dec. 2006 Internal Reviews;

ltyree
Download Presentation

VSOP-2 project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VSOP-2projectUpdate Tracking Station mtg,,Feb. 19 & 20, 2006, OAM Madrid Hisashi Hirabayashi /JAXA VSOP-2 Project status Spacecraft and instruments Act 2

  2. VSOP-2 Project Budget request was approved Dec. 2006 Internal Reviews; ISAS System Definition Review March 19, or 26. JAXA Project Review March, or April Project formal start April 1, 2007 (FY2007 start day) Project Manager Prof. Saito Project Scientist Prof. Tsuboi (transfer from Nobeyama R. O. Director after Hirax’s retirement ) Meetings; VSOP Lessons Learned mtg in Hakone April org.ed by YH/HH/LIG VSOP-2 symposium in Sagamihara Dec. 2007 Satellite ETS-VIII (now Kiku-VIII) launched and 2 LDRs were successfully deployed (Dec, 25-26, 2006). Launch in Jan.-Feb. 2012 is current plan, but ? Still Uncertainty in Launcher VLBI-Link 40GHz up and 37GHz down link, we propose.

  3. 30,000 km HALCA and VSOP (1997 - 2006) VLBI Space Observatory Programme Highly Advanced Laboratory for Communications and Astronomy 1.6 GHz (18 cm) 5 GHz (6 cm) Resolution of 360 μarcseconds at λ= 6 cm Launch: ISAS M-V rocket Feb. 12, 1997 10 years anniversary, a week ago ! Time flies as rockets do.

  4. HALCA/VSOP project started in April 1989 HALCA Launch in Feb. 1997 HALCA last command November 30, 2006 (3213 days after launch) HALCA/VSOP was a 17 years project, and terminated in March 2006. Lessons Learned mtg in Hakone, April l6, 17, 2007

  5. ISAS Astronomy satellites Series Astro-E launch failure2002 ? Astro-E II = Suzaku X-ray 2005 Astro-F = Akari IR 2006 Solar-B = Hinode Sun 2007 last usage of M-V rocket here is a long gap. Astro-G = ??? Radio 2012 NeXT X-ray

  6. Mass (wet) 910Kg • Power 1,800 W VSOP-2 spacecraft In-Orbit Configuration 7 modules Sub-reflector with 3-dim adjust. Solar Paddle Solar Paddle Feed/LNA 9m offset Cassegrain Antenna with Modular Structure Link Antenna Launch Configuration in M-V rocket Main-Reflector with 2-dim adjust

  7. Modular antenna structure for VSOP-2 • modular antenna structure deployment mechanism and back-structure same as ETS-VIII but with new antenna surface design (Study since 2000 with budgets) ETS-VIII(Kiku-VIII) was Launched in Dec. 2006, and was successfully Deployed as below. ½ scale 7 modules successful deployment test in 2006 Oct. by Ariane piggyback

  8. VLBI Link system High Gain Antenna Diameter: 80cm Astro-G Proposed frequency VLBI Data Downlink Frequency 37-38 GHz Bit Rate 1 Gbps Modulation QPSK TX-Power 20 W Phase Transfer Uplink Frequency 40 GHz No Modulation TX-Power 10 W Ground Link Station Diameter >10m Data Storage Data Storage Capacity 4 TB / 8 hours H Maser Phase Comparison

  9. Phase-referencing observation Study • Rapid switching between target and phase reference sources • Increase sensitivity • Astrometric studies • Requirements • 3 degeree separation within 1 min cycle High torque actuator : CMG (Control Moment Gyro) with 4 Reaction Wheels Orbit determination accuracy: < 5cm with GPS + SLR Problems; Expensive CMGs OD accuracy cannot be enough Consideration or Decision needed ?? Control Momentum Gyro(Honeywell)

  10. Solar-B, Solar X-ray/Opt/UV Observatory, was renamed HINODE which means “sunrise”. It was launched near the sunrise into sun-synchronous orbit. HINODE launch by M-V-7 (the last M-V launch) September 23, 2006 US/European contribution to HINODE On-board Instruments (US,UK) Tracking support (ESA) Uncertainties for Astro-G launcher H-IIA other ? Orbit ? in case of shared launch

  11. Astro-G Tracking Meeting, Feb, 2007, OAM Madrid VSOP-2 Mission, Concluding Remarks 2nd Generation space-VLBI mission VSOP-2 is now funded for Astro-G satellite launch in Feb. 2012, And the project will formally start in April 2007. (Phase-A to Phase-B) Design study and mission planning are in progress, Group is being established in Japan. VSOP-2 Orbit

  12. 2006 US/Japan meeting, Socorro, Feb. EVN Directors mtg, Firenze, May Europe/Japan mtg, JIVE, June COSPAR GA, Beijin, July IAU GA, Prague, Aug. EVN symp. Torun, Sept. Tracking meeting, Pasadena, Oct. Nov. EVN Directors mtg,Bonn, Nov. 2007 Lessons Learned mtg, April 18, 19, Japan (?) Europe/US/Japan mtg, May, Bonn VSOP-2 symposium Dec. 3-6. ISAS VSOP-2 Selected Contractor Selection (Now) Budget Announciation (Dec. 2006) ISAS Mission Def. Review JAXA Review VSOP-2 Project start (April 2007)

  13. 5 Stations Tracking Network for HALCA VSOP-2 tracking station(s) in the European longitude Yebes South Africa ? 10m 64m 13m 40m 43 GHz Space- Ground baseline at Yebes HALCA-Usuda first fringes (via 10m) (64m) at 1.6 GHz This slide was shown to Dr. Southwood and ESA members more than once.

  14. VLBI Two-Way Link Need to make basic design soon so that each partner can understand and explain to funding agencies. Need to establish an international Study team by interested (or approved) parties. VSOP had 5 stations network with 3 different design; Usuda (ISAS) 1 DSN (JPL) 3 GB(NRAO) 1 with compatibility test One group to design one scheme is important.