1 / 15

Minneapolis Lake Hiawatha

Minneapolis Lake Hiawatha. Minneapolis Lake Hiawatha. Proposed Layout. Proposed Layout. Code Considerations: Zero-depth / beach entry – ADA (MN 1101) Maximum 2 ft. depth (MN 4717.0250, Subp.12 & 4717.1850, Subp. 2A) Abigail Taylor Act – main drains

Download Presentation

Minneapolis Lake Hiawatha

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minneapolis Lake Hiawatha

  2. Minneapolis Lake Hiawatha

  3. Proposed Layout

  4. Proposed Layout • Code Considerations: • Zero-depth / beach entry – ADA (MN 1101) • Maximum 2 ft. depth (MN 4717.0250, Subp.12 & 4717.1850, Subp. 2A) • Abigail Taylor Act – main drains • Virginia Graeme Baker Act (federal) – main drains

  5. Proposed Cross-Section

  6. Pool Skimming Gutter System

  7. Pool Features Code Considerations: MN Rules part 4717.2350, Subp. 12. “Fountains or similar features…must be located in areas of two feet or less of water depth. They must be designed to preclude climbing.”

  8. Pool Features Ground Geysers

  9. Pool Features Blue Heron Spray

  10. Pool Features Cattail Spray

  11. Site Features Fencing Code Considerations: MN Rules part 4717.1550, Subp. 4. “Fencing for a wading pool enclosure must be at least…48 inches high for new installations.” MN Rules part 4717.1550, Subp. 5. “New chain link fencing must not exceed 1-1/2 inch mesh for fencing less than eight feet high.”

  12. Site Features Fencing – metal tubing

  13. Site Features Benches

  14. Site Features Shade Structures

  15. Project Schedule Public Meetings: May Design: June – July Bid Phase: 30 days: July – Aug. Construction Start: late Aug. – Sept. Open: Summer 2011

More Related