1 / 28

Ericson University March 2013 Welcome!

Ericson University March 2013 Welcome!. EU March 2013 Agenda. 2013 Product Introduction Schedule 1140 Series LED Product Launch On-line Product Selectors Quote Process Essentials Freight Included Discussion WESCO / AD Marketing Update. 2013 Product Introduction Schedule.

Download Presentation

Ericson University March 2013 Welcome!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ericson UniversityMarch 2013Welcome!

  2. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  3. 2013 Product Introduction Schedule

  4. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  5. 1140 Key Product Features and Associated Customer Benefits • Madein the USA • Support for North American manufacturing • Family owned and operated since 1918 (4th generation) • LEDLighting Technology • Low power consumption • Reduced operational costs • Additional job-site circuit availability • cULusOutdoor / Wet Location Listed • UL Listed provides customers with peace-of-mind and confidence • Safe, reliable operation is assured indoor or when exposed to the elements

  6. 1140 Key Product Features and Associated Customer Benefits • Cool White LED • Reduced eye stress and associated health concerns • Improved workplace ergonomics from glare-free operation • Daisy-chainConnectivity • Simplified cable routing • Reduced cabling expense • Multiple light connectivity from a single circuit

  7. 1140 Key Product Features and Associated Customer Benefits • 50,000Hour Life Expectancy • Reduced replacement costs • Reduced down-time and maintenance costs • Lightweight, Impact Resistant Material • Increased product longevity • Simplified installation and handling • Green/ Ecologically Friendly Materials • Support for sustainable “green” friendly initiatives • Flexiblemounting alternatives • Hang or stand to meet changing operational requirements

  8. 1140 Market Opportunities • Tunnel Lighting • Construction, water and electrical utilities • Task Lighting • Assembly / repair, inspection, construction, law enforcement • Entertainment Venues • Fairs, concerts, carnivals, fund raising • Emergency Medical Care • Triage, pre/post-operative locations, counseling • Defense / Safety • Temporary command posts, food facilities, living quarters

  9. 1140 Market Opportunities • Utility Maintenance • Electrical, water, phone, cable, • Recreational Events • Carnivals, fairs, food services, receptions, outdoor parties • Tent Lighting • Military, emergency response, medical care, carnivals • Construction Sites • Commercial, residential

  10. 1140 Series LED Product Launch • Trade Pricing • Price Differential Over Fluorescent • ~25%

  11. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  12. On-line Product Selectors http://eselect.ericson.com/

  13. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  14. Quote Process Essentials • Responsiveness / Quick Turn-around • Completeness Is Critical • Improves Turn-around Time Significantly • Eliminates Confusion and Errors • Eliminates Need for Multiple Quote Generation • All Quote Requests Are Logged and Tracked • All Request Need to Be Submitted Utilizing Defined Process • On-line Form • http://www.ericson.com/RFQ_Masterhtml.html • Email • quotes@ericson.com

  15. Quote Process Essentials

  16. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  17. Freight Included Clarification … • Commission % vs. Commission $$$ • Freight Excluded • Straight Commission % Applies • Commission $$$ = Quoted Value * 10% • $23,748 * 10% = $2,375 Commission

  18. Freight Included Clarification … • Commission % vs. Commission $$$ • Freight Included • Same Commission $$$ • Commission % Will Vary on Quote • $23,748 * 10% = $2,375 Commission … No Freight • Commission % = $2,375 / ($23,748 + $800) … Freight Included = 9.6% • $24,748 * 9.6% = $2,375 Commission … Freight Included • Same Commission $$$

  19. EU March 2013 Agenda • 2013 Product Introduction Schedule • 1140 Series LED Product Launch • On-line Product Selectors • Quote Process Essentials • Freight Included Discussion • WESCO / AD Marketing Update

  20. WESCO - COGS & Global Accounts Global Accounts 69% Increase Top 25 Global Accounts: Ericson U.S. 2012 COGS

  21. 2013 Marketing Planning • 2013/2014 Buyers Guide – 6 pages • One WESCO Branch Trade Shows – 5 shows • Birmingham – 5/2 • Norfolk – 9/5 • Industrial Program: • Global Accounts Customer Relationship Handbook - Handbooks featuring supplier's industrial capabilities, printed for our new Global Account wins • Temp power and LED lighting will be featured • Petrochem Capabilities Brochure – 3Q

  22. 2013 WESCO Marketing Programs

  23. AD Rewards • Introduction packet sent to all Affiliates

  24. AD Rewards Literature Literature available on rep login to order Email version also available

  25. RepLink Phase 1 Will go LIVE TODAY! Login – first initial; last name Password – ericson1 (will ask you to re-set password) Email Kristin with questions

  26. Access RepLink from Ericson home page

  27. Ericson UniversityMarch 2013Thank You For Attending!

More Related