Mock-up activities . 19 July 2011 R. Vuillermet. Mock up activities. Status 12-07-2011 :Reception of the pit table at CERN Since a week, installation of the optical fibbers on the mock up, side A done, side C on progress
E N D
Mock-up activities 19 July 2011 R. Vuillermet
Mock up activities • Status • 12-07-2011 :Reception of the pit table at CERN • Since a week, installation of the optical fibbers on the mock up, side A done, side C on progress • Installation and adjustment of the pit table on the rotating table during the week 29 • Installation of the wire tension system during week 29
LPSC Tooling fabrication progress Pit table delivered to CERN Thin tables and container (delivery week31/32) Pit table assemble with thin table Intermediate table assembly (delivery week30)