1 / 18

GES-TWA vs. WOs TWA WBS & SOW TWA Examples TWA SOW Templates 7 (a) 7 (b) 7 (c) 7 (d) 7 (e) 7 (f)

Introduction to Work Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter H July 10, 2014. Discussion Items. GES-TWA vs. WOs TWA WBS & SOW TWA Examples TWA SOW Templates 7 (a) 7 (b) 7 (c) 7 (d) 7 (e) 7 (f) Questions & Comments. The Nature of a GES-H Project Can be.

lucine
Download Presentation

GES-TWA vs. WOs TWA WBS & SOW TWA Examples TWA SOW Templates 7 (a) 7 (b) 7 (c) 7 (d) 7 (e) 7 (f)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction toWork Breakdown Structure (WBS) & SOW Templates for TWAs of GES-Chapter HJuly 10, 2014

  2. Discussion Items • GES-TWA vs. WOs • TWA WBS & SOW • TWA Examples • TWA SOW Templates • 7 (a) • 7 (b) • 7 (c) • 7 (d) • 7 (e) • 7 (f) • Questions & Comments

  3. The Nature of a GES-H Project Can be • Watershed Management Plan • Watershed Management Plan Update • Drainage Improvement Study • Water Quality Assessment & BMPs • Stormwater Inventory • Peer Review • Misc. Engineering Support • ENG/GIS Review • FEMA DFIRM Support • Other Support

  4. GES-TWA vs. Traditional Work Orders WO#1 WO#2 WO#3 WO#4 WO#5 …… WO#1 WO#2 WO#3 WO#4 WO#5 …… WO#1 WO#2 WO#3 …… WO#1 WO#2 WO#3 …… NTP TWA NTP NTP ? WMP – SWRA, WQ BMPs Watershed Evaluation WMP – Floodplain Analysis WMP – FPLOS, Alternatives Analysis

  5. Master Agreement Requires a “Proposal” for Each TWA Project Development

  6. GES-TWA WBS & SOW Project Development 7 (a) Watershed Evaluation 7 (b) Peer Review & As-needed Engineering Support 7 (f) Watershed Management Plan - Floodplain Analysis 7 (c) 7 (e) 7 (d) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.

  7. WMP/WMP Update – Full Range Example Project: City of Williston WMP (FY15 CFI) Project Development 7 (a) Watershed Evaluation 7 (b) Watershed Management Plan - Floodplain Analysis 7 (c) 7 (e) 7 (d) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ

  8. WMP/WMP Update – Floodplain Analysis Example Project: Mill Creek WMP (FY15 CFI) Project Development 7 (a) Watershed Evaluation 7 (b) Watershed Management Plan - Floodplain Analysis 7 (c) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ

  9. WMP – FPLOS, Alternatives Analysis, SWRA & BMPs of Water Quality Example Project: Powell WMP Project Development 7 (a) Watershed Evaluation Watershed Management Plan - Floodplain Analysis 7 (e) 7 (d) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ

  10. WMP/WMP Update – Peer Review Example Project: Lake Stafford/Priest Prairie/W. Marion WMP Peer Review Project Development 7 (a) Watershed Evaluation Peer Review & As-needed Engineering Support 7 (f) Watershed Management Plan - Floodplain Analysis Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ

  11. GES-TWA WBS & SOW Project Development 7 (a) Watershed Evaluation 7 (b) Peer Review & As-needed Engineering Support 7 (f) Watershed Management Plan - Floodplain Analysis 7 (c) 7 (e) 7 (d) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ Note: 7 (a), (b), (c) … indicates the new SOW template for corresponding element.

  12. District Defined Submittals, Stopping Points, and Reviews Generic WMP – Floodplain Analysis

  13. Send Questions & Comments to WMPWork@swfwmd.state.fl.us by July 25th, 2014

  14. Drainage Improvement Study Example Project: Southway Villas BMP Alternatives Analysis (FY15 CFI) Project Development 7 (a) Watershed Evaluation Watershed Management Plan - Floodplain Analysis 7 (d) Watershed Management Plan - FPLOS Determination, Alternatives Analysis, and Recommendations Watershed Management Plan - Surface Water Resource Assessment (SWRA) & BMPs for WQ

  15. Stopping Points (i.e., District Notice)

  16. “Pre-submittal Meeting” in New SOWs

  17. Example List of Deliverables (Task 2.2.3)

  18. Deliverables – Data Delivery Structure

More Related