Developing the Business Case for Updating the Region’s End-use Load Shapes

Developing the Business Case for Updating the Region’s End-use Load Shapes. Assessment of Findings. Presented by Curt Puckett and Lorin Molander. August 21, 2012. Overview of Presentation. Project Objectives Overview of End-Use Data Findings from Stakeholder Webinars & Interviews

lucio
Download Presentation

Developing the Business Case for Updating the Region’s End-use Load Shapes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Developing the Business Case for Updating the Region’s End-use Load Shapes Assessment of Findings Presented by Curt Puckett and Lorin Molander August 21, 2012

  2. Overview of Presentation • Project Objectives • Overview of End-Use Data • Findings from Stakeholder Webinars & Interviews • Updates Since 2009 • National Perspectives & Resources • Preview of Business Case

  3. Project Objectives • Develop the business case for a comprehensive PNW electric end-use data collection study • Assessment of Regional Interest and Need • Assessment of Updates since 2009 KEMA Study • Assessment of National and Out-of-Region Resources • Assessment of the No Action Option • Analysis of Options for Proceeding with Study • Develop the Business Case for a Range of Viable Options

  4. Section 3: Overview of End-Use Data • Background and context: • What is it? • Who uses it? • How is it used? • How is it collected or developed? • Existing data sources NEEA RBSA metering data provided by Ecotope

  5. Section 4: Assessment of Regional Interest and Need • Objective: Lay the foundation for the business case by assessing the current interests and needs of the region’s stakeholders. • Process: Webinars and Interviews, discussing: • How do the groups currently use end use information, • How do the they envision using the data in the future, • What are the risks associated with continuing to use the current data, • What business decisions are being made based on their analyses, and • What are their current data requirements and priorities?

  6. Webinar Series

  7. Summary of Stakeholder Input Via Webinars • A general consensus that end-use data was important to their utility’s business operation; • While difficult to quantify the monetary benefits associated with improved information, the utilities were making significant investments based on the information flowing through the analysis; • Concern with the existing data coverage, timeliness and relevance; • The importance and need for better time-differentiated information was increasing; • The availability of supporting information had significantly increased including the expansion of smart meter investments yielding access to time-differentiated whole facility information; and • There may be various approaches that could be used to help fill the existing data gaps.

  8. Common Concerns About Existing Data Sources • The vintage (i.e., age) of the data (1980s – early 1990s); • That appliance characteristics and usage have changed (e.g., increased efficiency standards); • There are new emerging/growing technologies (e.g., computers, plasma TVs, etc.); • ELCAP did not adequately capture small “standby” loads, which is a category of load that has grown significantly since ELCAP; • Static loads are not in the majority anymore (it’s either motors or electronics); • The existing load shape data are often “problematic” and require some conditioning, (e.g., load peaking at strange times); and • There is strong interest in measure shapes, not just end-use load shapes.

  9. Stakeholder Interviews • Based on feedback from the webinars, interview questions were developed: • Current State; • Current or potential use(s) • Source(s) of data • Recent updates or developments of new end-use data • Concerns/issues with current sources • Future State; • Investment(s) based on analyses using end-use information; • Specific data requirements and supporting information; • Sampling and study preferences; and • Load shape library user preferences. • 17 interviews of Pacific Northwest stakeholders: • 15 organizations were represented • 38 individuals participated • 18 were from EE • 10 were from a load forecasting/load research • 10 were from resource acquisition, smart grid, DR, transmission, regulatory

  10. Summary of Stakeholder Input Via Interviews • Current uses of load shapes and demand statistics • Cost effectiveness analysis • Energy efficiency and demand response planning and evaluation • Savings forecasts, conservation potential, smart grid, cost of service and rates, load forecasting, and measure savings/load impacts • Distribution planning, resource planning, and load composition modeling • Potential uses of end-use load shapes or demand statistics • Provide the effects of energy efficiency on capacity and capacity-related charges • Better differentiate economic from appliance trends • Inform data validation routines • Provide input to new rate designs • Support dynamic profiling • Help characterize “new” loads including electric vehicles

  11. Business Decisions & Investments Based on Analyses • Whether to add in demand-side or supply-side resources; • Which energy efficiency or demand response programs to pursue based on expected savings; • Where to set energy efficiency program incentive levels, • How to improve program forecasting, program targets, total budgets; • Cost-effectiveness, what investments should be made in which programs; • How to allocate within a cost of service study; • Analyze new rate designs, e.g., time-of-use rates; and • New technology investments related to smart grid.

  12. Business Decisions & Investments Based on Analyses (cont.) • How much investment does your organization make overall related to analyses • While difficult to quantify a direct link, the overall level of investment made, in part, based on the end-use data was significant • Numbers in the “millions” of dollars were commonly stated • What was unclear is how better or more current information would have altered those decisions • Importance of end-use load shape data to analyses overall • On a scale of 1 to 7 (with 1 being not at all important and 7 being very important) • About half ranked the importance of end-use load shape data to their analyses overall as a 5, 6, or 7

  13. Importance of Accurate Load Shapes • Risks of using potentially inaccurate load shapes • Making poor investment decisions; • Implementing energy efficiency programs that are not cost effective; • System operations (i.e., managing load) are at risk without better information; • Potentially target too much or too little conservation; • Not saving what we think we are during peak hours; and • Forecasting errors resulting in being too “long” or “short” on resources. • Importance of accuracy of end-use information to overall results • Slightly more than half said that the accuracy ranked a 6 or a 7 in importance to the overall results of their analyses

  14. Results of Priority Ranking – Residential End-Uses

  15. Results of Priority Ranking – Residential Measures

  16. Results of Priority Ranking – Non-Residential End-Uses

  17. Results of Priority Ranking – Non-Residential Measures Note: This table does not depict entire list of measures provided to respondents, only those measures that ranked medium, high, or highest

  18. Data Granularity • Level of granularity • One hour or 15 minute increments • Shorter increments if feasible • The need for shorter intervals was specifically due to DR • Future data granularity needs • About half said no different than now • About one-third expected to need five minutes

  19. Sampling and Precision, Study Length • Precision Requirements • About half had specific precision requirements, same as PURPA • Single vs. Multiple End-Uses • About a third of the group said their analyses focused on multiple end-uses • Importance of Research • Case Study of Individual End-Uses • Most ranked this low in importance • Statistical Sample of Single End-Uses • About half valued this research higher in importance • Statistical Sample of Multiple End-Uses • This option was ranked high by most respondents • Length of End-Use Study • At least a year • Limited timeframe would be acceptable in certain cases

  20. Load Shape Library • Load Shape Library Accessibility • online option • FTP • searchable database • Load Shape Library Format • Almost half preferred Excel • CSV, SAS or Access. • Site versus Aggregated Data • both raw site-level data and aggregated data • Most Useful Pre-aggregated Data • Lots of answers for how to summarize data

  21. Section 5: Regional End-Use Research Activities (Post 2009) • NEEA’s Residential Building Stock Assessment (RBSA) • BC Hydro’s Residential End-Use Metering Project (REUMP) • NorthWestern Energy’s End-Use and Load Profile Study

  22. NEEA RBSA Metering Project • This study is currently underway • Plans to meter 90% of the end-uses within about 100 homes • Metering for two years • 5-minute interval energy for: • whole premise, • the sub-metered end-uses, • indoor temperature for the main living area, • outdoor temperature, • Other measurements: • 5-minute snapshots of service voltages, true power, and power factor • Gas furnace and gas water heater run-times • Lighting cycles

  23. BC Hydro’s Residential End-Use Metering Project (REUMP) • 13 employee volunteer households sub-metering about 40 end-uses per home • This project is being developed in four phases: • Proof of Concept (2008-2009): Test the idea of using a Zigbee wireless network to collect interval data in a home. • Testing (2009-2010): Equipped three homes with about 100 of these end-use recorders (Ploggs) to test the software and data collection procedures. • Pilot (Current): Goal of covering about 20 homes (currently 13) fully end-use metered with about 800 devices. • Full Implementation (Future): If the Pilot phase is successful, implement a statistical sample of about 300 residential homes across the Province. • BC Hydro staff indicated they are open to collaborating with other organizations in the region for the full implementation phase of the study.

  24. NorthWestern Energy’s End-Use and Load Profile Study • Completed in December 2009 • Supports conservation potential assessment • Based on on-site surveys and past studies • Monthly load shapes for residential • Monthly and hourly load shapes for commercial • Hourly shapes based on modeled data

  25. Section 6: National Perspectives • Eight respondents • Not as much representation from EE as PNW interviews • Uses of the data and types of decisions being made from results were generally the same as the PNW • Magnitudes of decisions were also in $M, like the PNW • Concerns about data were similar - vintage • Specifically plug loads and new appliance trends • Risks of using inaccurate load data were still mostly associated with mis-characterizing cost effectiveness of EE (even though most were not from EE) • The priority rankings for end-uses and measures all came in generally lower in rank than for the PNW, especially for measures.

  26. National Resources – Load Shapes • NEEP Commercial Lighting Load Shape Study • Assembled information across a wide range of EE evaluation studies • NEEP Commercial Unitary HVAC • Large sample of Unitary HVAC from Maryland to New England (n>400) • Glasgow Electric Plant Board • 30 home sample metering WH, HVAC, Refrigerator, Range, Dishwasher, Washer, and Dryer • 20 home Grid Smart appliance change-outs including HPWH and Energy Smart appliances • EPRI Load Shape Library and Customer Load Insights Interest Group • Residential End-Use Metering Program, Australia

  27. National Resources – Data Collection Protocols NEEP Draft Protocols International Performance Measurement and Verification Protocol ASHRAE Guideline 14 California Evaluation Protocols Federal Energy Management Program Guidelines ELCAP Other Relevant Projects

  28. Section 7: Preview of Business Case Development • Considerations for an Effective Study • End-Use and Measure Priorities • Review of Updates Since 2009 • Sample Size and Design Issues • Types of Data and Information to Collect • Transferability • Sustainability of the Approach • Data Library and User Interface

  29. Section 8: No Action Option • Challenges with No-Action Option • Lack of current load shape data for electronics • Increasing value of demand impacts • Concerns about current load shapes reflecting current behavior (e.g., TOU rates) • Interaction and load shape dependence on occupancy • Risks with the No-Action Option • Lack of understanding what drives customer load patterns • Poor planning • Inaccurate projections • Inaccurate forecasts • Resulting in the “wrong” type of investment

  30. Section 9: Business Case Development • The Minimal Case • meets the highest priority needs • lower range estimate in terms of cost and level of effort • The Base Case • meets a greater range of stakeholder needs • attention still given to project costs, time and resource (i.e. staff) requirements • The Premium Case • relaxes concerns about data acquisition costs and resource requirements • focusing on what the stakeholders could obtain through a multi-year end-use data collection effort, unconstrained by costs, time and/or resource limitations • A description of each including costs and benefits will be presented in September

  31. Residential Options • A Minimal Case • Energy shares developed from CDA • Whole facility metering by housing type • Hourly load shapes for HVAC and WH (expand RBSA sample) • Simulation modeling by housing type (conditioned to whole facility load) • Simulation modeling for SFR (conditioned to RBSA end-use metering) • The Base Case (Builds on Minimal Case) • Expansion of RBSA within Region • The Premium Case (Builds on Base Case) • Extension of RBSA to multi-family • Extension of RBSA to manufactured housing • Simulation modeling by housing type conditioned to end-use metering

  32. Non-Residential Options • A Minimal Case • Whole facility metering by facility type • Large survey to secure facility information • On-site sample to secure information for simulation modeling (selected facility types) • Simulation modeling by facility type conditioned to whole facility load • The Base Case (Builds on Minimal Case) • Add: End-use metering for selected end-uses within selected business types • Simulation modeling for selected facility type conditioned to end-use metering • The Premium Case (Builds on Base Case) • Add: End-use metering for additional end-uses within additional business types • Simulation modeling for additional facility type conditioned to end-use metering

  33. www.dnvkema.com www.dnv.com