40 likes | 166 Views
Peak RCCo Performance Metrics. Draft –November 2013. MISO R.C. Measures. MISO R.C. Measures. FERC Considerations. 1. Percentage of RC directives issued correctly and when needed. 2. Availability/correctness of day ahead operating studies. a. IROL/SOL defined
E N D
Peak RCCo Performance Metrics • Draft –November 2013
FERC Considerations • 1. Percentage of RC directives issued correctly and when needed. • 2. Availability/correctness of day ahead operating studies. • a. IROL/SOL defined • 3. Availability/correctness of real-time studies • a. IROL/SOL defined • 4. Availability/correctness of monitoring tools. • a. IROL/SOL defined • 5. Up to date and effective operating procedures regarding • a. Balancing Operations • b. Transmission Operations • i. Identification of specific generation dispatch to resolve WECC Path overloads in real time. • ii. Identification of specific operating contacts to develop, agree upon, and implement procedures. • iii. Detailed Restoration procedures of lines that have potential phase angle issues when opened and identification of generation resources that are effective in facilitating restoration. Supported with operating studies. • iv. Identification and resolution of voltage issues • c. System Restoration • d. Operations Planning • e. Emergency Operations • f. Generator Operational Requirements • g. Certification and Training Requirements • h. Operating agreements • 6. Implementation/resolution of Recommendations (pertaining to the RC) from the Arizona-Southern California September 8, 2011 outages. • 7. Availability of support staff (on-site or remote).