Freshwater Basin Management: Experiences and Lessons from the Lake Chad Basin

Freshwater Basin Management: Experiences and Lessons from the Lake Chad Basin. Presenter Engr. Muhammad Sani ADAMU, Executive Secretary, Lake Chad Basin Commission, N’Djamena (CHAD). Key Issues identified by GEF project (Climatic Causes).

lukas
Download Presentation

Freshwater Basin Management: Experiences and Lessons from the Lake Chad Basin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Freshwater Basin Management: Experiences and Lessons from the Lake Chad Basin Presenter Engr. Muhammad Sani ADAMU, Executive Secretary, Lake Chad Basin Commission, N’Djamena (CHAD).

  2. Key Issues identified by GEF project (Climatic Causes) • Lake level decline/Climatic changes: considerable fall in the level of Lake Chad and loss of piezometric heads in associated aquifers • decline in perennial vegetation

  3. Key Issues pertinent to the session’s theme, identified by GEF project (Climatic Causes Contd.) • increase in vulnerability to erosion • transboundary migration of human populations • increased ecological stress on upstream resources

  4. Key Issues pertinent to the session’s theme, identified by GEF project (Climatic Causes Contd.) • abandonment of traditional, effective resource management practices • problems of fishing access for two riparian States (Niger and Nigeria) • problems of surface water for large-scale irrigation projects (Nigeria)

  5. Key Issues pertinent to the session’s theme, identified by GEF project (Climatic Causes Contd.) • rainfall decline led to decrease in wet season flooding • consequent effect of a decline in reception capability of natural habitats

  6. Human Causes:Persistent Rural Poverty • Human pressures on the resource base, including: • deforestation • bush burning • unsustainable agricultural practices

  7. Human Causes (Contd.) • Human pressures coupled with drought: • desertification

  8. Negative Consequences of Human Causes: • Potential for the mis-allocation of the water resource base, particularly between large irrigated systems and elements of the natural system • formation of spirals of degradation, with one harmful action causing other harmful actions

  9. Negative Consequences of Human Causes (Contd.): • Increased competition for the natural resource base among production activities, leading to disputes difficult to resolve and creating serious tension between and among various countries and interests

  10. Negative Consequences of Human Causes (Contd.): • Creation of tangible threats to the environment with consequent environmental diminution • possible increase in pollution from such sources as oil drilling and production, mining, unsustainable agricultural practices, pesticide use

  11. Negative Consequences of Human Causes (Contd.): • Further deterioration of the natural environment if there continues to be an absence of cooperation at all levels and a continuing inability of existing institutions to develop and implement a clear and consistent strategy at the regional level.

  12. 3. Short-term Policy Focus • Absence of an integrated approach to water resources management at the national and basin levels • costly investment that is abandoned because of unforeseen changes in water availability

  13. 3. Short-term Policy Focus (Contd.): • Construction of large dams upstream without taking sufficient account of downstream human and ecosystem considerations • mining operations not sufficiently co-ordinated with regional water and environmental policies

  14. 3. Short-term Policy Focus (Contd.): • Failure of development strategies in rural areas, including those related to human health. • development of agricultural and industrial activities geared to production quantities often at the expense of environmental sustainability.

  15. 4. Non-existent/Unsuitable Water & Env. Mgt Policies • Absence of integrated, regionally based water management programs • insufficient knowledge of water resources and functioning of aquatic ecosystems

  16. 4. Non-existent/Unsuitable Water & Env. Mgt Policies (Ctd) • No effective system for monitoring quantity and quality of freshwater resources, nor are there effective water quality protection programs • ineffective management of water demand and little attention paid to adapting production methods to natural resource limitations

  17. 4. Non-existent/Unsuitable Water & Env. Mgt Policies (Ctd) • Too little value accorded to water and the environment in economic policies, absence of economic instruments and incentive measures, and absence of specific programs to promote and support local initiatives

  18. Poor inter-sectoral program co-ordination, limited public participation and impact: • Low-level public participation and inadequate mechanisms to secure such participation • insufficient cooperation between and among sectors within countries and between and among the countries themselves

  19. Poor inter-sectoral program co-ordination, limited public participation and impact (Contd.): • Non-existence of environment-centered public education • few efforts made to harmonize legal frameworks at the regional level to protect and make use of shared water resources sustainable

  20. Poor inter-sectoral program co-ordination, limited public participation and impact (Contd.): • Natural and regional organizations do not respond or adapt well to rapidly changing circumstances, making it difficult if not impossible to effectively and equitably manage shared water resources

  21. Poor inter-sectoral program co-ordination, limited public participation and impact (Contd.): • Donors historically have provided little incentive for the creation of a co-ordinated and sustained policy of long-term assistance aimed at autonomous and lasting development.

  22. How Project address issues and challenges - Purpose • To overcome barriers to concerted management of basin through collaboration and capacity building • To complete a TDA and a descriptive framework for concerted water management in the basin

  23. How Project address issues and challenges - Purpose(Cont) • Prepare a GEF SAP for long-term implementation of priority actions to address transboundary issues • Test implementation modalities through pilot projects, stakeholder involvement and demonstration of capacity of riparian countries.

  24. Project Outputs • Project mechanisms: a Program Coordinating Unit(PMU), nominated lead agencies to drive and coordinate TDA completion, pilot projects, policy initiatives, and institutional linkages

  25. Project Outputs (Contd) • Enhanced regional policy initiatives and institutional machanisms to address transboundary issues • Strengthened engagement of stakeholders • A TDA and framework for concerted management in basin

  26. Project Outputs (Contd) • Demonstration projects to test and validate methodologies, stakeholder involvement and implementation modalities • GEF SAP designed and endorsed with implementation methodologies validated, donor support mobilized.