An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMPREHENSIVE EVERGLADES RESTORATION PLAN Acme Basin B Discharge Public Workshop May 22, 2002

  2. COMPREHENSIVE EVERGLADES RESTORATION PLAN Workshop Goals • To inform the public about the Acme Basin B Discharge project. • To familiarize the public with the implementation process. • To solicit initial public comment at an early stage in the study in order to address as many of those comments as possible during the study’s public involvement process. • To consider all comments.

  3. Topics • Comprehensive Everglades Restoration Plan (CERP) • CERP Process • Project Information • What’s Next • How to be Involved

  4. The C&SF Project • Project Purposes:Flood control, water conservation, regional water supply, prevention of salt water intrusion, fish and wildlife conservation, water supply to Everglades National Park • Project includes:10 locks, 1,000 miles of canals, 720 miles of levees, over 150 water control structures, and 16 pump stations

  5. South Florida Ecosystem • Area - 18,000 square miles • Population 1950s ~ 0.5 million • Population today ~ 6 million

  6. Too much/too little water for the Everglades/south Florida ecosystem Massive reductions in wading bird populations Degradation of water quality Repetitive water shortages and salt water intrusion Declining estuary health 1.7 billion gallons of water a day wasted to tide A Region in Trouble….

  7. On December 11, 2000, President Clinton signed the Water Resources Development of 2000, approving: Rescuing an Endangered Ecosystem: The Plan to Restore America’s Everglades Comprehensive Everglades Restoration Plan A series of environmental and other improvements over 30 years with an estimated cost of $7.8 billion The Central and Southern Florida Project Comprehensive Review Study (The Restudy)

  8. Comprehensive Everglades Restoration Plan (CERP) • Water storage areas/facilities • 15 surface storage reservoirs • 3 in-ground reservoirs • 330 aquifer storage and recovery wells • 19 stormwater treatment areas • 2 wastewater reuse plants • Removal of over 240 miles of canals, levees and structures • Operational changes

  9. Quantity Quality Timing Distribution Getting the Water Right

  10. Goals & Objectives for the Restudy GOAL:Enhance Ecologic Values • Objectives: • Increase the total spatial extent of natural areas • Improve habitat and functional quality • Improve native plant and animal species abundance and diversity GOAL:Enhance Economic Values & Social WellBeing Objectives: • Increase availability of fresh water (agricultural/municipal & industrial) • Maintain existing flood protection (agricultural/urban) • Provide recreational & navigation opportunities • Protect cultural & archeological resources and values

  11. Project Goals and Objectives • Same as the Restudy… • Project Example • System-wide Objective: Improve Habitat and Functional Quality • Elsewhere in the system… downstream • Local Objective: Improve Habitat and Functional Quality • Within footprint of project boundary

  12. Plan Formulation and Evaluation • Define Measures (Components) • Develop Planning Cost • Estimates (Real Estate, • Construction, O&M) • Evaluate Measures (compare • with and without plan • conditions) • Conduct Incremental Cost • Analysis • Compare Alternative Plans • Conduct Environmental Assessments RECOVER • Conduct System-Wide • Evaluation of Plans

  13. Project Formulation CERP - individual projects were selected based on their synergistic effect to the overall plan Projects - formulated to achieve local and system- wide goals and objectives as defined by CERP • Must consider different measures, components, features, and project scales within the project area • Structural and non-structural approaches

  14. Project Evaluation/Assessment • 3-step process • Select Plan based on the project that reasonably maximizes the project’s contribution toward the system-wide benefits of CERP compared to cost

  15. Step 1Optimize System-wide Benefits • Ensures the system-wide goals and objectives defined by the Comprehensive Plan are achieved • Define the project features that optimize system performance and system-wide benefits • Costs and benefits measured at the system-wide level for each of the alternative plans • Selected project will be the plan that reasonably maximizes the project’s contribution toward the system-wide benefits of CERP compared to cost

  16. Step 1 – System-wide BenefitsFuture Condition Assumptions Future Without-Project Condition Assumptions Future With-Project Condition Assumptions Authorized CERP Projects Project Being Evaluated No CERP Unauthorized CERP Projects

  17. Step 2Assessing Incremental Benefits Attributable to the Project • Assessment measures the contribution of the project to system-wide benefits output • Quantify and describe the incremental costs and benefits of the selected project • Costs and benefits are incremental to the total CERP project

  18. Step 2 – Incremental BenefitsFuture Condition Assumptions Future Without-Project Condition Assumptions Future With-Project Condition Assumptions Authorized CERP Projects Authorized CERP Projects Project Not Included Project Being Evaluated Unauthorized CERP Projects Unauthorized CERP Projects

  19. Step 3Assess Interim Operations • Establish baseline year for operations • Develop interim operational strategies • various operations should be considered to make the plan more efficient as an interim project • Assess local impacts • Evaluating the output of the selected projecttogether with authorized projects provides an assessment of local and system-wide impacts due to interim operations

  20. Step 3 – Interim Operations AssessmentFuture Condition Assumptions Future Without-Project Condition Assumptions Future With-Project Condition Assumptions Authorized CERP Projects Authorized CERP Projects Project Being Evaluated

  21. COMPREHENSIVE EVERGLADES RESTORATION PLAN Acme Basin B Discharge Project

  22. Southern Blvd Pump #4 Pump #3 Basin A Forest Hill Blvd Pierson Road 7 Basin B Lake Worth Road Acme 10S G-94D Water Conservation Area 1 Wellington/ACME Improvement District Basin

  23. Project Background • Everglades Forever Act (1994 - present) • Everglades Stormwater Program (1996 - current) • Comprehensive Review Study included Acme Basin B Discharge as an OPE (1998) • WPA Feasibility Study (1998 - 2002) • Baseline Data Reports (1999 - current) • Chemical Treatment with Solids Separation (CTSS) pilot project (2000 - current) • Basin Specific Feasibility Studies (2001- current)

  24. Basin Specific Feasibility Studies • For basins associated with EFA requirements • Currently in Task 4, evaluation of alternatives to be completed August 2002 • Information from the studies can be used when formulating alternatives in the CERP process

  25. Basin Specific Feasibility StudiesAcme Basin B Alternatives Burns & McDonnell • Expand STA 1W (& possibly STA 1E) • Divert Runoff to the Palm Beach Aggregates Rock Pit Brown & Caldwell • Divert Runoff to the Agricultural Reservoir • Chemical Treatment Component in the Basin • STA Component in the Basin

  26. Basin Specific Feasibility StudiesWeb Site www.sfwmd.gov/org/erd/bsfboard/bsfsboard.htm

  27. Project Purpose The purpose of the Acme Basin B project is to provide water quality treatment and stormwater attenuation for runoff from Acme Basin B prior to discharge to the Loxahatchee National Wildlife Refuge (Water Conservation Area 1) or alternate location. Excess available water may be used to meet water supply demands.

  28. ProjectGoals & Objectives • Evaluate Alternatives • Meet 2006 Schedule • Everglades Forever Act • Comprehensive Everglades Restoration Plan (CERP) • Meet Program Authority Limit • $25 million

  29. Where we are and what is next... • Project Management Plans • Management document only • Project Implementation Reports • bridge the gap between the comprehensive plan and detailed project design

  30. State &CongressionalAuthorization ProjectCooperationAgreement We are here ProjectImplementationReport(including NEPA) Plans&Specs Project MgmtPlan Detailed Design Operate Operate Construct Real Estate Acquisition Monitoring and Adaptive Assessment CERP Standard Project Development Process

  31. COMPREHENSIVE EVERGLADES RESTORATION PLAN Project Management Plans Are: • Lists of anticipated tasks, responsibilities, schedules, products, and budget for the next project phase • General description of work and level of effort required • “Roadmaps” for activities and monitoring • Flexible - will be updated regularly, and as needed

  32. COMPREHENSIVE EVERGLADES RESTORATION PLAN Project Management Plans Are Not: • A decision document • Lists of each and every task that may be required • Detailed scopes of work • Set in stone

  33. COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Project Implementation Reports (PIRs) • Feasibility level decision documents • PIRs will bridge the gap between the comprehensive plan and projects, and design, permitting construction • FWS, EPA and NPS will provide significant resources during this project phase

  34. COMPREHENSIVE EVERGLADES RESTORATION PLAN The PIR will address: • Compliance with environmental requirements: • National Environmental Policy Act (NEPA): Chapter 401Permit (discharge permit) • Chapter 402 Permit (construction permit) • Endangered Species Act • Clear Air Act • Clean Water Act • And others • Economic/environmental justice issues: • Effects of project on minorities and low income communities

  35. COMPREHENSIVE EVERGLADES RESTORATION PLAN The PIR will address: • Water quality issues: • Modeling • Evaluation of existing WQ data • Everglades Basin Specific Feasibility Study • Evaluation of STA’s performance benefits • Watershed assessment / water budget analysis: • Review Restudy assumptions • Seepage evaluation • Hydrological/hydraulic data (rainfall, evapotranspiration, pumping records, historical structure data, etc.) • Establish conveyance requirements • Establish storage needs • Modeling scenario runs • Evaluate existing and future level of flood protection

  36. Planning Process Specify ProblemsAnd OpportunitiesStep 1 Inventory and Forecast ConditionsStep 2 Formulate Alternate PlansStep 3 Evaluate Effects of Alternative PlansStep 4 Compare Alternative PlansStep 5 Select Recommended PlanStep 6

  37. How to be involved... • PMP Phase • workshops • PDT meetings • PIR Phase • workshops • PDT meetings • Mailing Lists • Web Sites

  38. COMPREHENSIVE EVERGLADES RESTORATION PLAN Internet Web Sites www.evergladesplan.org www.sfwmd.gov www.saj.usace.army.mil

  39. www.evergladesplan.org

  40. Contacts SFWMD Kathy Collins, Project Manager (561) 682-2534 email: kcollin@sfwmd.gov USACE Jerry Grubb, Project Manager (904) 232-2771 email: Gerald.K.Grubb@saj02.usace.army.mil SFWMD EllenUnderwood,Senior Communications Specialist (561) 682-6013 email: eunderwo@sfwmd.gov

  41. Thank you Comments?