110 likes | 209 Views
E. Wiezorrek, O.H. Bauer MPE Garching. EGSE/IEGSE and MIB. Starting Point: Routine Phase. Major Goal : Sm ooth T ransition between Mission Phases. EGSE Working Group. Started in Oktober 1999 Goal: Common development of EGSE for ILT and IST Up to now 45 telecons or meetings Participants:
E N D
E. Wiezorrek, O.H. BauerMPE Garching EGSE/IEGSE and MIB EGSE/IEGSE
Starting Point: Routine Phase EGSE/IEGSE
Major Goal: Smooth Transition between Mission Phases EGSE/IEGSE
EGSE Working Group • Started in Oktober 1999 • Goal: Common development of EGSE for ILT and IST • Up to now 45 telecons or meetings • Participants: • HIFI, PACS, SPIRE • Di/TOS • Project • HSC and • Alcatel • Astrium EGSE/IEGSE
EGSE/HCSS Set-up for ILT EGSE/IEGSE
EGSE for ILT • Common development: • CDMS Simulator SPIRE • Test Equipment Interface concept HIFI • Router HIFI • SCOS 2000 support Di/TOS • MIB support Di/TOS, HSC • First complete version: mid 2002 • Test Control PACS • TOPE Di/TOS, PACS • Out of Limit / Telecommand History ESOC, SPIRE, HSC • Available now • On-board Software Management ESOC EGSE/IEGSE
IEGSE/CCS for IST EGSE/IEGSE
IEGSE Hardware • The IEGSE is a common purchase by all three Herschel Instruments based on ILT-EGSE concept • Hardware set-up can be reconfigured to replace any failed system • The IEGSE has been pre-configured and tested at MPE on 20/22 Sep 04 by three instrument teams and HSC • The IEGSE has been installed at Astrium, Ottobrunn, and acceptance tested together with CCS on 15/17 Nov 04 • CCS/IEGSE configuration has been used for first WE tests of SPIRE and PACS (mid Dec 04) EGSE/IEGSE
EGSE Hardware Overview EGSE/IEGSE
IEGSE Overview EGSE/IEGSE
Bug in TOPE system of CCS SPR raised When a test procedure read a TM parameter not always the most recent value is read which seriously hampers CcsHandler When PACS/DPU and CCS/CDMU front end are started at the same time the first TC has to be sent twice NCR raised MIB – HPSDB bridge file conversion is not stable yet MIB changes required due new naming conventions for HPSDB Set-up of CCS seems to be complex Access to remote ICC sites not yet possible OBS upload not yet possible: ESOC OBSM sytem will be used Next EGSE WG meeting at Astrium, Ottobrunn, on 26 Jan 05 to discuss overall PLM EGSE situation Open Points EGSE/IEGSE