E. Wiezorrek, O.H. Bauer MPE Garching

E. Wiezorrek, O.H. Bauer MPE Garching. EGSE/IEGSE and MIB. Starting Point: Routine Phase. Major Goal : Sm ooth T ransition between Mission Phases. EGSE Working Group. Started in Oktober 1999 Goal: Common development of EGSE for ILT and IST Up to now 45 telecons or meetings Participants:

luke-jensen
Download Presentation

E. Wiezorrek, O.H. Bauer MPE Garching

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E. Wiezorrek, O.H. BauerMPE Garching EGSE/IEGSE and MIB EGSE/IEGSE

  2. Starting Point: Routine Phase EGSE/IEGSE

  3. Major Goal: Smooth Transition between Mission Phases EGSE/IEGSE

  4. EGSE Working Group • Started in Oktober 1999 • Goal: Common development of EGSE for ILT and IST • Up to now 45 telecons or meetings • Participants: • HIFI, PACS, SPIRE • Di/TOS • Project • HSC and • Alcatel • Astrium EGSE/IEGSE

  5. EGSE/HCSS Set-up for ILT EGSE/IEGSE

  6. EGSE for ILT • Common development: • CDMS Simulator SPIRE • Test Equipment Interface concept HIFI • Router HIFI • SCOS 2000 support Di/TOS • MIB support Di/TOS, HSC • First complete version: mid 2002 • Test Control PACS • TOPE Di/TOS, PACS • Out of Limit / Telecommand History ESOC, SPIRE, HSC • Available now • On-board Software Management ESOC EGSE/IEGSE

  7. IEGSE/CCS for IST EGSE/IEGSE

  8. IEGSE Hardware • The IEGSE is a common purchase by all three Herschel Instruments based on ILT-EGSE concept • Hardware set-up can be reconfigured to replace any failed system • The IEGSE has been pre-configured and tested at MPE on 20/22 Sep 04 by three instrument teams and HSC • The IEGSE has been installed at Astrium, Ottobrunn, and acceptance tested together with CCS on 15/17 Nov 04 • CCS/IEGSE configuration has been used for first WE tests of SPIRE and PACS (mid Dec 04) EGSE/IEGSE

  9. EGSE Hardware Overview EGSE/IEGSE

  10. IEGSE Overview EGSE/IEGSE

  11. Bug in TOPE system of CCS SPR raised When a test procedure read a TM parameter not always the most recent value is read which seriously hampers CcsHandler When PACS/DPU and CCS/CDMU front end are started at the same time the first TC has to be sent twice  NCR raised MIB – HPSDB bridge file conversion is not stable yet MIB changes required due new naming conventions for HPSDB Set-up of CCS seems to be complex Access to remote ICC sites not yet possible OBS upload not yet possible: ESOC OBSM sytem will be used Next EGSE WG meeting at Astrium, Ottobrunn, on 26 Jan 05 to discuss overall PLM EGSE situation Open Points EGSE/IEGSE