1 / 9

THE OPPORTUNITY FOR CPP’S TO INJECT POWER INTO GRID UNDER OPEN ACCESS

THE OPPORTUNITY FOR CPP’S TO INJECT POWER INTO GRID UNDER OPEN ACCESS. GENERATING UNITS IN SOUTHERN REGION. A.P. TYPICAL GENERATOR SPREAD IN SR. KAR. - HYDRO. - THERMAL. KER. TN. GENERATORS ABOVE 1000 MW. - GAS / NAPTHA. GENERATORS 500 – 1000 MW. - NUCLEAR.

lumina
Download Presentation

THE OPPORTUNITY FOR CPP’S TO INJECT POWER INTO GRID UNDER OPEN ACCESS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE OPPORTUNITY FOR CPP’S TO INJECT POWER INTO GRID UNDER OPEN ACCESS

  2. GENERATING UNITS IN SOUTHERN REGION A.P TYPICAL GENERATOR SPREAD IN SR KAR - HYDRO - THERMAL KER TN GENERATORS ABOVE 1000 MW - GAS / NAPTHA GENERATORS 500 – 1000 MW - NUCLEAR GENERATORS BELOW 500 MW

  3. CPP/IPP PLANTS IN SOUTHERN REGION A.P KAR KER TN

  4. Breakup of long term PPAs, STOAs and UI in SR 2005 – 06 2004 – 05 All figures in MUs

  5. Breakup of Export, Import and Wheeling in the STOA in SR 2005 – 06 2004 – 05 All figures in MUs

  6. 220 KV CHIKKODI – KOLHAPUR D/CLINE KOLHAPUR (MAHARASHTRA) CHIKKODI KARNATAKA M.L.PURA BELGAUM MAPUSA NARENDRA 220 PONDA (Goa) AMBEWADI HUBLI XELDEM(GOA) KODASALLI KADRA NAGJHARI 220 KV CIRCUIT 1 GUTTUR KAIGA NOT TO SCALE DISTANCES EXAGERATED FOR CONVENIENCE 400 KV CIRCUIT 2

  7. STOA Charges Analysis/Comparision

  8. PERCENTAGE OF STOA’S BY IPP/CPP vis-à-vis OTHERS PRESS ESC

More Related