1 / 5

A) PELLEGAIA cut view

-> Crush -> Knead ->. A) PELLEGAIA cut view. Cement (less than 5%) & water. Filler Granular. B) PELLEGAIA working mechanism. Inner blade Clockwise To scrape the material upward. Anti clockwise

lupita
Download Presentation

A) PELLEGAIA cut view

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. -> Crush -> Knead -> A) PELLEGAIA cut view Cement (less than 5%) & water Filler Granular

  2. B) PELLEGAIAworking mechanism Inner blade Clockwise To scrape the material upward. Anti clockwise To knead and press the material. Outer scraper To scrape the material toward inner working area. Rotor (knife type blade) To crush the material and make into granular. Rotor arm Rotor rotation The both in clockwise and anti clockwise. Rotor arm rotation The both in clockwise and anti clockwise. Outer blade arm Inner scraper To scrape the material toward outer working area. Outer blade Clockwise To scrape the material upward. Anti clockwise To knead and press the material.

  3. C) PELLEGAIAPictures for rotor and blade in working. Rotor To crush the material and make into granular. Blade Working in clockwise To scrape the material upward. Blade Working in anti clockwise To knead and press the material.

  4. D) PELLEGAIALine up

  5. E) PELLEGAIASpecification Capacity: 1) Batch system: To feed from top and to discharge from bottom 2) Required time for one batch: 5mimutes including feed and discharge time. 3) Mixing proportion: Filler 80% + Water 15% + Cement 5%

More Related