Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations

Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations March 20, 2008. Expressway Operations. Florida Highway Patrol (FHP). Squad Patrols 6 am – 10 pm, 7 days a week Evaluating Current Staffing Levels

luyu
Download Presentation

Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Orlando-Orange County Expressway Authority Update L.A. GriffinManager of Expressway Operations March 20, 2008

  2. Expressway Operations Florida Highway Patrol (FHP) • Squad Patrols 6 am – 10 pm, 7 days a week • Evaluating Current Staffing Levels • Meet target response times and maximize productivity

  3. Road Ranger Motorist Assistance Service Patrol • Joint Project with Florida’s Turnpike Enterprise • Original Contract: Sept. 2001 • 138,997 Assists thru Sept. 14, 2007 • New Contract: Sept. 15, 2007 • 2622 Assists in Jan-08 • 13,092 Assists thru Jan-08

  4. Road Ranger Motorist Assistance Service Patrol APL Approved DMS AVL / Electronic Logging

  5. Online: Video System • 144 Closed Circuit Television Cameras • Viewed at OOCEA facilities & FDOT District 5 RTMC • Multicasting OOCEA video to FDOT • Receiving FDOT multicast video • Reciprocal control of video • TV Stations are Broadcasting

  6. Online: Travel Time Information • 97 Data Collection Sensors • Read transponders to determine travel times • Data Server Travel Time Software • Feeds OOCEA DMS, FDOT 511 • Feb-08 Uptime: 99.93%

  7. Dynamic Message Signs (DMS) • 35 Dynamic Message Signs • 19 operational • Feb-08 Message Uptime: 94.5% • 16 under construction SR 520 South of SR 528 (FDOT ROW) SR 417 North of SR 408

  8. Performance Monitoring • Before/After Analysis • SR 408 Widening impact • Monthly Reporting • Operational Indicators • Candidate Outcome Measures • Travel Times: Free Flow, Average, 95% Reliable, Thresholds • Travel Time Indices • % of Peak Period with Congestion

  9. Upcoming Project • SR 408 Core Project (599-503) • 7 new and 6 relocated CCTV cameras • 19 new and 1 relocated Data Collection Sensor Sites • 38 sites converted to field Gigabit Ethernet Switches • Bidding: Summer, 2008 I-4 / SR 408 Interchange

  10. Thank You!