Orlando-Orange County Expressway Authority Update L.A. Griffin Manager of Expressway Operations March 20, 2008. Expressway Operations. Florida Highway Patrol (FHP). Squad Patrols 6 am – 10 pm, 7 days a week Evaluating Current Staffing Levels
E N D
Orlando-Orange County Expressway Authority Update L.A. GriffinManager of Expressway Operations March 20, 2008
Expressway Operations Florida Highway Patrol (FHP) • Squad Patrols 6 am – 10 pm, 7 days a week • Evaluating Current Staffing Levels • Meet target response times and maximize productivity
Road Ranger Motorist Assistance Service Patrol • Joint Project with Florida’s Turnpike Enterprise • Original Contract: Sept. 2001 • 138,997 Assists thru Sept. 14, 2007 • New Contract: Sept. 15, 2007 • 2622 Assists in Jan-08 • 13,092 Assists thru Jan-08
Road Ranger Motorist Assistance Service Patrol APL Approved DMS AVL / Electronic Logging
Online: Video System • 144 Closed Circuit Television Cameras • Viewed at OOCEA facilities & FDOT District 5 RTMC • Multicasting OOCEA video to FDOT • Receiving FDOT multicast video • Reciprocal control of video • TV Stations are Broadcasting
Online: Travel Time Information • 97 Data Collection Sensors • Read transponders to determine travel times • Data Server Travel Time Software • Feeds OOCEA DMS, FDOT 511 • Feb-08 Uptime: 99.93%
Dynamic Message Signs (DMS) • 35 Dynamic Message Signs • 19 operational • Feb-08 Message Uptime: 94.5% • 16 under construction SR 520 South of SR 528 (FDOT ROW) SR 417 North of SR 408
Performance Monitoring • Before/After Analysis • SR 408 Widening impact • Monthly Reporting • Operational Indicators • Candidate Outcome Measures • Travel Times: Free Flow, Average, 95% Reliable, Thresholds • Travel Time Indices • % of Peak Period with Congestion
Upcoming Project • SR 408 Core Project (599-503) • 7 new and 6 relocated CCTV cameras • 19 new and 1 relocated Data Collection Sensor Sites • 38 sites converted to field Gigabit Ethernet Switches • Bidding: Summer, 2008 I-4 / SR 408 Interchange