Relocation Fibre Ducts in LHC1 and LHC5. HL-LHC J. Troller EN-EL 2019. Works – Relocation of fibre ducts. Optical fibre ducts (Ø40mm, grey) with optical fibre cables inside Optical fibres are part of control & communication (C&C) networks
E N D
Relocation Fibre Ducts in LHC1 and LHC5 HL-LHC J. Troller EN-EL 2019
Works – Relocation of fibre ducts • Optical fibre ducts (Ø40mm, grey) with optical fibre cables inside • Optical fibres are part of control & communication (C&C) networks • Works executed during YETS in 1st half of 2018 • No interruption of network services was required • The ducts were relocated for the whole section of the tunnel in each area (P5R, P1L, P1R) over a length approx. 150m each. • Future works • A new relocation of C&C ducts is foreseen in LS3 which will also include a further study taking into account also the other civil engineering works to be done in those areas and the Beam Instrumentation ducts.
Works completed (Image courtesy of A. Gonzalez) P1R P5R P1L Originally Relocated
Documentation • ECR: Relocation of cables, optical fibres and services for connection of HL-LHC UPRs to LHC . EDMS nº 1845754