Hard Chrome Replacement NADEP Jacksonville

Hard Chrome Replacement NADEP Jacksonville. February, 2002 Michael Linn Materials Engineering. Hard Chrome Replacement TF34 Affordable Readiness Initiative. ARI POA&M Develop fixturing/masking including drawings Complete Prototype HVOF repairs Complete Complete

Download Presentation

Hard Chrome Replacement NADEP Jacksonville

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hard Chrome ReplacementNADEP Jacksonville February, 2002 Michael Linn Materials Engineering

  2. Hard Chrome ReplacementTF34 Affordable Readiness Initiative • ARI POA&M • Develop fixturing/masking including drawings Complete • Prototype HVOF repairs Complete Complete • Perform 50 hour engine test cell endurance run Complete • Visually and dimensionally evaluate coatings after engine test Complete • Update repair manuals Complete • Air Force Approval Complete • Install new Multi-Coat Cell HVOF Complete • Implement repairs Complete

  3. Hard Chrome ReplacementTF34 Affordable Readiness Initiative • Identified Parts / Replacement Coating - Highlighted parts have been prototyped and installed in test engine. Parts Currently in production at NADEP Jacksonville

  4. Hard Chrome ReplacementTF34 Navy & Air Force Engines • Production Status • 100% of fixturing/masking completed including drawings • Gained AF approval • New Multi-coat cell is complete • Approximate Number of Parts Processed by Production: 50 Axis B Bevel Gears 30 B-Sump Housing & # 6, #7 Bearing Housings 20 # 5, 6, & 7 Carbon seal runners 5 Years processing # 3 Bearing Housing (APS T800)

  5. TF34 Axis-B Bevel Gearshaft P/N 6008T48P01 S/N HPC 01271 T800 HVOF Diamalloy 3001 After 50 hr. engine run

  6. TF34 B-Sump Housing P/N 6018T02G03 S/N GGM00204 T800 Plasma Spray Metco 68F-NS After 50 hr. engine run

  7. TF34 HPC Rear Shaft P/N 6016T83P01 S/N GAT 17106T800 T800 HVOF Diamalloy 3001 After 50hr. engine run

  8. TF34 No. 5 Carbon Seal Runner P/N 4019T60G01 HVOF Tungsten Carbide/Cobalt Diamalloy 2005 - 83/17 After 50 hr. engine run

  9. TF34 No. 6 Carbon Seal Runner P/N 4020T02G02 S/N BJW 00494 HVOF Tungsten Carbide/Cobalt Diamalloy 2005 - (WC/Co 83/17 After 50 hr. engine run

  10. TF34 No. 7 Carbon Seal Runner after 50 hr. engine run Note minute flat-line chatter marks from grinding operation with corresponding wear marks from mating part

  11. HVOF as a Hard Chrome Replacement Status of New HVOF Cell at NADEP JAX Specification for HVOF Cell Complete Contract Award - March 29, 2000 Complete Natural Gas Line Stubbed-out at Service Pad Complete Blast cabinets for Cell #7 Installed & Operational Complete Sound-proof enclosed room Complete Exhaust plenum & Air Handling System Complete FANUC 5-Axis Robot System for Cell #7 Complete Multi-Coat Process Control Unit Installed Complete System functional checks Complete

  12. Multi-Coat Cell #7 Powder Feeder “Teach Pen” Process Controller

  13. Multi-Coat Cell #7 NADEP Jacksonville Witness Specimens Exhaust plenum TF-34 Bevel Gear Fanuc 5 Axis Robot Sulzer Metco Hybrid Diamond Jet

  14. Conclusion • NADEP Jacksonville now Chrome free on TF-34, F 404, F414, F1D2 • NADEP Jacksonville has 3 J-52 parts remaining to be Chrome free on all engines - Rear Compressor Drive Turbine Shaft #5 Bearing Journal - No. 4 Bearing Housing - Spur Gear shaft

  15. Prototype Produced in June, 1999 - Approval Pending J52 Rear Compressor Drive Turbine Shaft One of 3 remaining Cr Plated Engine Parts, NADEP Jax

  16. Development of Navy PositionJOAP • Concern regarding replacement of Cr:Once Cr is replaced, should the • JOAP Program add an element (W or Co) as a replacement for Wear • Metal Analysis ? • Assumption: The JOAP program currently uses [Cr] to indicate wear on • Cr Plated Wear Surfaces; [Cr] used to indicate potential failures. Data from 47,770 JOAP Samples: -

  17. Development of Navy PositionJOAP • Data from 47,770 J-52 JOAP Samples indicates: • 2 engines were removed for high Cr (8-9PPM) without the presence • of high Fe. Those engines were 660673 (A-6) and 661049 • (A-4 Aircraft). Engine 696959 was closely monitored around June, • 1995 and was returned to normal after the Cr failed to increase. NAVAIR Site Jacksonville Materials Engineering position: No evidence that Cr by itself provides utility for JOAP, at least not for the J-52. Cr Data provided to FST for final determination.