1 / 4

PHOBOS Run 5 Readiness

PHOBOS Run 5 Readiness. Peter Steinberg / Robert Pak Brookhaven National Laboratory November 24, 2004. Run Preparation. Work left to be done in preparation for Cu-Cu physics run Several successful dry runs with new DAQ system Detector system is operational Current shift schedule

lynch
Download Presentation

PHOBOS Run 5 Readiness

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHOBOSRun 5 Readiness Peter Steinberg / Robert PakBrookhaven National Laboratory November 24, 2004

  2. Run Preparation • Work left to be done in preparation for Cu-Cu physics run • Several successful dry runs with new DAQ system • Detector system is operational • Current shift schedule • Shifts start Nov 29 @ 3pm.

  3. Physics Goals/Needs for Run 5 • Physics goals for planned Cu-Cu run • Energy and centrality dependence for • 4p observables (multiplicities, flow) • Particle spectra • Needs (Cu-Cu) • ~ 1 Billion events @ 200 GeV (1.5-4 nb-1 or 2+8 weeks) • ~ 150 Million events @ 62.4 GeV (2 weeks) • 1 day @ 22.4 GeV (injection)

  4. Run Conditions • Required run conditions to achieve goals – luminosity, b* etc. • Assuming b*=3m for 200 GeV as last year • Special requests: • Fixed-length stores are clearly optimal for overall operation of PHOBOS. • We would like additional time (e.g. 45 minutes) in a store if there is a substantial (>30 min) vacuum breakdown. • PHOBOS magnet has three states: even amount of data in each polarity and 10% field off. • (pp): Special 400 GeV run as early as possible.

More Related