CERN-RRB-2011-035. Status of the ALICE Maintenance and Operation budgets – Categories A &B. 30 th meeting of the ALICE RRB C. Decosse. Report on 2010 M&O-A income, outstanding contributions and expenditures 2011 Incomes and outstanding contributions 2011 current expenditures
E N D
CERN-RRB-2011-035 Status of the ALICE Maintenance and Operation budgets – Categories A &B 30th meeting of the ALICE RRB C. Decosse
Report on 2010 M&O-A income, outstanding contributions and expenditures • 2011 Incomes and outstanding contributions • 2011 current expenditures • M&O-A 2012 preliminary budget and estimates for the period 2013-2015 • M&O-A preliminary sharing • M&O-B 2012 preliminary budgets and estimates for the period 2013-2015
M&O-A incomes and outstanding contributions 2002-2010 • Closing date 31/12/2010 • Unit: KCHF • Outstanding paid early 2011:Greece 43 kCHFCroatia 22 kCHFRussia 25 kCHF • Still due for 2002-2010Poland 36 kCHFBrazil 24 kCHFChina Beijing 13 kCHFJINR 34 kCHFUkraine 41 kCHF • Over paidArmenia + 5 kCHFUSA DOE + 77 kCHF
M&O-A summary 2002-2010Cash balance: Income and Payments in kchf
M&O-A Income and outstanding 2002-2011 (as 8 April 2011 in kchf)
2011 M&O-A expenditures in kchf as beginning of April 2011 – Power not included
Preliminary 2012 M&O-A budget and cost estimates for 2013-2015 IN KCHF • Budget prepared with the following operating model a 2-months Technical Stop (Jan-Feb 2012) followed by a 10-months Running (Mar-Nov 2012) and a 17-months Shutdown (Dec 2012-Apr 2014). • Request will be reviewed by the SG over Summer.
2012 M&O-A sharing • Preliminary numbers based on 1/9/2010 heads count • No rebate on energy in 2012 since the 2010 budget was totally spent
MoUs • South Africa recently signed addenda to the MoUs • Two addenda under preparation with Indian institutes (Bose Inst. Kolkata and Gauhati University) which joined the Collaboration in 2011. • Pending signatures: Brazil and China