An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on the HEC-RAS Reservoir Transport Simulation Mike Langland and Ed Koerkle 03/30/2012

  2. Topics • Sediment Input Data • Model Geometry and Hydraulics • Model Sediment Transport

  3. Susquehanna River Reservoirs

  4. Transport Curves

  5. Particle Size Transport (Conowingo) 391 samples % sand/fines 16 samples % sand/silt/clay Missing data ?

  6. Model Geometry and Hydraulics

  7. Boundary and USGS transect data Marietta Gaging Site Conestoga River Safe Harbor Dam Holdwood Dam Pequea Creek Muddy Run Broad Creek PA MD Conowingo Dam

  8. With FEMA adds Marietta Gaging Site Conestoga River Safe Harbor Dam Holdwood Dam Pequea Creek Muddy Run Broad Creek PA MD Conowingo Dam

  9. Add Lidar

  10. Elevation Discrepancies

  11. Sediment Transport Simulation • Progress limited • Calibrate one “average” flow year (no scour) and a high flow event (Sept 2011) • Bed sediment particle size distribution and shear stress

  12. Summary • Model Geometry and Hydraulics nearly complete • Issue with GeoRAS resolved (max # of transect points) • On schedule to have HEC-RAS model completed by June, 2012.